Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
1890 N 13TH AV
Address NEW:
1890 N 13TH AV
Apply Date:
04/06/2020
Applicant:
Drew Wentz
Description:
SITE - Silver Street, new warehouse building. 443 W. Plata Street.

Permit Reviews

Permit Number - DP20-0072
Permit Status: Complete
Permit Description: SITE - Silver Street, new warehouse building. 443 W. Plata Street.
Start Date Submittal Complete Date Status  
04/06/2020 DEV PKG - OK TO SUBMIT 04/08/2020 COMPLETED Review Details
04/08/2020 DEV PKG 05/08/2020 COMPLETED Review Details
05/17/2021 DEV PKG - OK TO SUBMIT 05/21/2021 COMPLETED Review Details
05/21/2021 REVISION - - 1ST 06/08/2021 COMPLETED Review Details
06/11/2020 DEV PKG - RESUBMITTAL 07/10/2020 COMPLETED Review Details
07/17/2020 DEV PKG - RESUBMITTAL 08/12/2020 COMPLETED Review Details
08/13/2020 DEV PKG - RESUBMITTAL 08/13/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0072
Permit Description: SITE - Silver Street, new warehouse building. 443 W. Plata Street.
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/16/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final.}
07/16/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final.}
07/16/2021 ENGR Engineering Final Passed {Activity date: 07/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final.} ; {Activity date: 03/25/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VLEON1 - Not ready FOR 443 W PALTA ST, courtesy unscheduled inspection for Jim the builder, owner also present.
Trash enclosure was constructed without inspection. Provide a stamped letter from the engineer of record stating that the trash enclosure was constructed in accordance with Department of transportation standard detail 6.01
Construct the accessible access route onto the property and the west portion of the site as shown. Changes require plan revision. Consult with project engineer about any issues with approved plan requirements.
Complete remaining work including landscaping, rainwater discharge from the building.And Detectable warning devices not installed at access ramp into parking lot.}
07/16/2021 SITE - Stormwater Follow-up Passed {Activity date: 07/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final.}
07/16/2021 ENGR Grading Final Passed {Activity date: 07/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final.}
07/16/2021 SITE - Stormwater Final Inspection Passed {Activity date: 07/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final.}
07/16/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 07/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final.}
07/16/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final.} ; {Activity date: 03/25/2021; Status: Denied; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - 1809 N 13TH AVE:
THIS WAS NOT A PER-CONSTRUCTION.IT A 9027 ENGINEERING FINAL .NEED A LETTER FROM THE ENGINEER OF RECORD FOR THE TRUNCATED DOMES AND THE TRASH BIN AND THE STREET ACCESS .THE TREES NEED the 11/2 staking.downspouts need to be installed.} ; {Activity date: 03/25/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - Partially approved FOR 443 W PLATA ST. Assist Martin with pre-construction meeting of project completed without inspections.

} ; {Activity date: 03/24/2021; Status: Denied; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Denied. Project nearing completion. No inspection history.
Contractor has been asked to schedule inspections from his development package permit. Jim at 603-6335.

}
07/16/2021 COT - ENGR - Signage Final Passed {Activity date: 07/16/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final.}

Documents

File Name Document Type  
ONLINE SUBMITTAL PAGE, RECVD 05.17.21.PDF DOCUMENTS VIEW
REVISION LETTER, 443 W. PLATA STREET.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
1-4 OF 4.PDF DEVELOPMENT PACKAGE VIEW
PIMA COUNTY ADDRESSING APPROVAL, 08.13.20.PDF DOCUMENTS VIEW
RESPONCE LETTER 7-17-20.PDF DOCUMENTS VIEW
RESPONSE LETTER 6-10-20 DP20-0072.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW