Permit Review Detail
Review Status: Completed
Review Details: DEV PKG - RESUBMITTAL
Permit Number - DP20-0072
Review Name: DEV PKG - RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/10/2020 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 07/06/2020 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 07/07/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Section Manager PROJECT: Silver Street Warehouse - 3 Development Package (2nd Review) DP20-0072 TRANSMITTAL DATE: July 7, 2020 DUE DATE: July 10, 2020 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is April 07, 2021. CONTENT REQUIREMENTS 1. This comment was not addressed. 443 W Plata St is located between Oracle and 13th on Plata, not between 13th and 14th as shown on the location map. 2-06.4.4.A - Does not appear that "THIS PROJECT" is pointing to the correct location and should be moved 1 block east. 2. Dp20-072 3. This comment was not fully addressed. Under General Notes, Street Sideyard you still list the setback as 10'. 2-06.4.9.O - The side street perimeter yard setback is not correct and should be 21' or the height of the exterior wall, greater of the two, measured to the nearest edge of travel lane along Plata & Thirteenth. 4. This comment was not fully addressed. The existing building height was not provided within the footprint. 2-06.4.9.Q - Provide the height of the existing and proposed building within the footprint. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 07/09/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 07/10/2020 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | RETURNED FOR CORRECTIONS NOTICE Your Next Step: Resubmittal of documents DESCRIPTION: SITE/GRADING - Silver Street Warehouse, 443 W. Plata Street, new building. PERMIT/ACTIVITY: DP20-0072 FEE BALANCE: $0 (zero) Thank you for the payment. SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews - click on Review Details - Documents - click on blue icon to the right of each document YOUR NEXT STEP: Submit documents to the Filedrop https://www.tucsonaz.gov/file-upload-pdsd 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff FOR FASTER PROCESSING: When on the Filedrop page, select the box "Development Package or Land Division". This applies to all DP submittals, DP resubmittals, and DP revisions - and all Land Splits. (For Building Permits, continue to select "Resubmittals/Revisions...".) - Name the 3rd submittal documents starting with the submittal number, for example: 3_Plan_Set Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services email: COTDSDPermits@TucsonAz.gov |
| 07/10/2020 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Needs Review | To Applicant: Please contact Pima Co. Addressing as their review has not started yet due to a balance owed by the Applicant. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/10/2020 | SBEASLE1 | OUT TO CUSTOMER | Completed |