Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/16/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final. |
| 03/25/2021 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by VLEON1 - Not ready FOR 443 W PALTA ST, courtesy unscheduled inspection for Jim the builder, owner also present.
Trash enclosure was constructed without inspection. Provide a stamped letter from the engineer of record stating that the trash enclosure was constructed in accordance with Department of transportation standard detail 6.01
Construct the accessible access route onto the property and the west portion of the site as shown. Changes require plan revision. Consult with project engineer about any issues with approved plan requirements.
Complete remaining work including landscaping, rainwater discharge from the building.And Detectable warning devices not installed at access ramp into parking lot. |
| 07/16/2021 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by RSALDAT1 - All 14 inspections, approved. Please change status to final. |
| 04/01/2021 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by VLEON1 - Partially approved FOR 443 W PLATA ST. Engineering has no issues that would prevent a temporary certificate of occupancy. Complete all work as required for final approval of project.
|
| 03/25/2021 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by VLEON1 - Not ready FOR 443 W PALTA ST, courtesy unscheduled inspection for Jim the builder, owner also present.
Trash enclosure was constructed without inspection. Provide a stamped letter from the engineer of record stating that the trash enclosure was constructed in accordance with Department of transportation standard detail 6.01
Construct the accessible access route onto the property and the west portion of the site as shown. Changes require plan revision. Consult with project engineer about any issues with approved plan requirements.
Complete remaining work including landscaping, rainwater discharge from the building.And Detectable warning devices not installed at access ramp into parking lot. |