Permit Details

Status:
Complete
Type:
Development Package
Address:
260 S CHURCH AV
Apply Date:
12/24/2019
Applicant:
Description:
SITE/GRADING/SWPPP/IID - TCC, Lot A, Parking Structure/Garage.

Permit Reviews

Permit Number - DP19-0312
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP/IID - TCC, Lot A, Parking Structure/Garage.
Start Date Submittal Complete Date Status  
03/20/2020 DEV PKG - RESUBMITTAL 04/08/2020 COMPLETED Review Details
06/25/2020 DEV PKG - OK TO SUBMIT 07/30/2020 COMPLETED Review Details
07/30/2020 REVISION - - 1ST 09/10/2020 COMPLETED Review Details
09/18/2020 REVISION - - 1ST 09/30/2020 COMPLETED Review Details
11/25/2019 DEV PKG - OK TO SUBMIT 12/30/2019 COMPLETED Review Details
12/30/2019 DEV PKG 02/03/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0312
Permit Description: SITE/GRADING/SWPPP/IID - TCC, Lot A, Parking Structure/Garage.
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/20/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved. Lyle with sundt at480-229-0120
Has installed controls around existing basin and at entry to the site. Will call for regular inspections of SWPPP and for all below grade stormwater piping and connections. Has hired a contractor to comply with recent change
To SWPPP permitting} ; {Activity date: 04/13/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Parking garage at TCC. Lyle with. 480–2 29–0120. Contractor installing temporary fence and preparing to remove asphalt and grub site. Contractor has an noi post SWPPP. Install controls as required. Please call for stormwater inspections on a regular basis.
Provide 6 inches of depressed landscaped areas as shown. Provide a right away permit and inspections for all work outside of Property.
Granier engineering Jason Morse 326-7082.
Desert survivors is responsible for Stormwater’s. Hallmark will be doing native plant preservation.}
11/17/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/17/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - }
11/17/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 11/17/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 09/17/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - partially approved. New signage has been installed as required.} ; {Activity date: 09/17/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - partially approved. New signage has been installed as required.
} ; {Activity date: 07/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Controls are in place. Additionally contractor has hired Derric Pooler as a stormwater consultant and will comply with the new SWPPP requirements. Lyle with sundt.} ; {Activity date: 04/24/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Temporary fencing, waddle, check out protection and signage has been installed. Lyle at 480-290-0120.} ; {Activity date: 04/24/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - . Partially approved. Temporary fencing, waddle, check out protection and signage has been installed. Lyle at 480-290-0120.}
11/18/2020 SITE - Stormwater Follow-up Passed {Activity date: 11/18/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 10/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out previously noted has been cleaned.} ; {Activity date: 10/16/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Minor track out noted. Lyle 480-229-0120} ; {Activity date: 10/16/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor track out noted. Lyle 480-229-0120} ; {Activity date: 09/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. There is minor track out on to church. Track out protection is starting to diminish. Stormwater controls around existing catch basin and site are still in place and in good condition.

} ; {Activity date: 09/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues.} ; {Activity date: 09/09/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues

} ; {Activity date: 07/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. There is no track out in the streets. There is track out protection in place. Lyle} ; {Activity date: 07/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. There is no track out in the streets. There is track out protection in place. Lyle} ; {Activity date: 07/21/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALKED THE SITE TOO SEE HOW THE SITE WAS BEING MANAGED DURING CONSTRUCTION, NO CONCERNS AT THIS TIME} ; {Activity date: 06/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No track out present at this time

} ; {Activity date: 06/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor track out Noted, no controls in place} ; {Activity date: 05/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Controls have been installed.} ; {Activity date: 05/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Stormwater contractor keeping logbook in Lyle’s office. Inspections every two weeks. Has swept the streets the last two days in a row. All controls are in place.

} ; {Activity date: 05/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Stormwater contractor keeping logbook in Lyle’s office. Inspections every two weeks. Has swept the streets the last two days in a row. All controls are in place.}
11/20/2020 SITE - Stormwater Final Inspection Passed {Activity date: 11/20/2020; Status: Approved; Inspector: BBENENDON; Comment: Entered by PAHUMAD1 - Approved. The SWPPP is for the entire site and will continue to be inspected under additional DP’s} ; {Activity date: 11/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Approved. The SWPPP is for the entire site and will continue to be inspected under additional DP’s}
11/24/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 11/24/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/18/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Partially approved. Provide tree stakes per job specifications.}
11/24/2020 ENGR Engineering Final Passed {Activity date: 11/24/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - }
11/24/2020 ENGR Grading Final Passed {Activity date: 11/24/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 11/19/2020; Status: Not Applicable; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Not applicable.
}
11/24/2020 COT - ENGR - Signage Final Passed {Activity date: 11/24/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - }

Documents

File Name Document Type  
REVIEW COMMENT RESPONSE, 09.18.20.PDF DOCUMENTS VIEW
REVISION LETTER, 07.24.20.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
LOI.PDF DOCUMENTS VIEW
1-22 OF 19.PDF DEVELOPMENT PACKAGE VIEW
APPLICATION.PDF DOCUMENTS VIEW
SOILS REPORT.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
COMMENT RESPONSE LTR, 03.18.2020.PDF DOCUMENTS VIEW