Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP19-0312
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2020 | SITE - Stormwater Follow-up | BBENEDON | Approved | Entered by PAHUMAD1 - |
10/28/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Track out previously noted has been cleaned. |
10/16/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. Minor track out noted. Lyle 480-229-0120 |
10/16/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Minor track out noted. Lyle 480-229-0120 |
09/21/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. There is minor track out on to church. Track out protection is starting to diminish. Stormwater controls around existing catch basin and site are still in place and in good condition. |
09/17/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. No issues. |
09/09/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. No issues |
07/28/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by JSCHNEI2 - Continued. There is no track out in the streets. There is track out protection in place. Lyle |
07/28/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. There is no track out in the streets. There is track out protection in place. Lyle |
07/21/2020 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - WALKED THE SITE TOO SEE HOW THE SITE WAS BEING MANAGED DURING CONSTRUCTION, NO CONCERNS AT THIS TIME |
06/18/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. No track out present at this time |
06/02/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Minor track out Noted, no controls in place |
05/18/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Controls have been installed. |
05/14/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Stormwater contractor keeping logbook in Lyle’s office. Inspections every two weeks. Has swept the streets the last two days in a row. All controls are in place. |
05/14/2020 | SITE - Stormwater Follow-up | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Stormwater contractor keeping logbook in Lyle’s office. Inspections every two weeks. Has swept the streets the last two days in a row. All controls are in place. |