Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
Permit Number - DP19-0312
Inspection Description - SITE - Stormwater Setup and Controls
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/2020 | SITE - Stormwater Setup and Controls | BBENEDON | Approved | Entered by PAHUMAD1 - |
09/17/2020 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by JSCHNEI2 - partially approved. New signage has been installed as required. |
09/17/2020 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by JSCHNEI2 - partially approved. New signage has been installed as required. |
07/20/2020 | SITE - Stormwater Setup and Controls | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Controls are in place. Additionally contractor has hired Derric Pooler as a stormwater consultant and will comply with the new SWPPP requirements. Lyle with sundt. |
04/24/2020 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by RSALDAT1 - Partially approved. Temporary fencing, waddle, check out protection and signage has been installed. Lyle at 480-290-0120. |
04/24/2020 | SITE - Stormwater Setup and Controls | BBENEDON | Partial Approval | Entered by RSALDAT1 - . Partially approved. Temporary fencing, waddle, check out protection and signage has been installed. Lyle at 480-290-0120. |