Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP19-0142
Permit Details
Apply Date:
06/05/2019
Applicant:
Description:
SITE/GRADING - Dunkin Donuts.
Permit Reviews
Permit Number - DP19-0142
Permit Status: Complete
Permit Description: SITE/GRADING - Dunkin Donuts.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/06/2020 | DEV PKG - OK TO SUBMIT | 01/09/2020 | COMPLETED |
01/09/2020 | DEV PKG - REVISION | 01/13/2020 | COMPLETED |
05/07/2019 | DEV PKG - OK TO SUBMIT | 06/07/2019 | COMPLETED |
06/10/2019 | DEV PKG | 07/12/2019 | COMPLETED |
07/19/2019 | DEV PKG - RESUBMITTAL | 08/20/2019 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0142
Permit Description: SITE/GRADING - Dunkin Donuts.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/03/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 02/03/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
02/03/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 02/03/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/16/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Concrete containment installed. Provide track out protection as needed.} | |
02/03/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/03/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/09/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Vincent and John with Reliance construction, Vince 401-7618. } |
|
02/03/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 02/03/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
02/13/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 02/13/2020; Status: Approved; Inspector: RLEDONNNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/03/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME, ALL THE LANDSCAPE ITEMS HAVE NOT BEEN COMPLETED AT THS TIME.COMPLEETE PLANTING THROUGHOUT AS SHOWN ON THE APPROVED PLANS. PLACE DG OR HYDROSEED IN ALL THE REMAINING DISTURBED AREAS THAT REMAIN WITH DISTURBED SOIL. THIS WILL INCLUDME THE AREA NORTH OF THE NEW TRASH ENCLOSURE, AND ALL AREAS TOWARDS THE NORTHWEST CORNER OF THE SITE.} | |
02/13/2020 | ENGR Engineering Final | Passed | {Activity date: 02/13/2020; Status: Approved; Inspector: RLEDONNNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/03/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS OKAY FIOR A TCO AT THIS TIME PENDING ALL OTHER INSPECTIONS. THIS SITE IS NOT READY AT THIS TIME FOR A FINAL, ALL THE LANDSCAPE ITEMS HAVE NOT BEEN COMPLETED AT THS TIME. COMPLEETE PLANTING THROUGHOUT AS SHOWN ON THE APPROVED PLANS. PLACE DG OR HYDROSEED IN ALL THE REMAINING DISTURBED AREAS THAT REMAIN WITH DISTURBED SOIL. THIS WILL INCLUDME THE AREA NORTH OF THE NEW TRASH ENCLOSURE, AND ALL AREAS TOWARDS THE NORTHWEST CORNER OF THE SITE. INSTALL THE HANDICAP SIGNS AT THE PROPER HEIGHT OF 7 FOOT CLEARANCE ABOVE GRADE. REMOVE THE BOLLARDS AS DISCUSSED ON THE SOUTH SIDE OF THE SITE ADJACENT TO THE FUTURE SIGN LOCATION, SO THAT THE CORRECT NUMBER OF PARKING LOCATIONS CAN BE ACCOUNTED FOR.} |
|
02/13/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 02/13/2020; Status: Approved; Inspector: RLEDONNNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/04/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT READY AT THIS TIME, AND THERE ARE NO CONCERNS AT THIS TIME} ; {Activity date: 01/07/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues or concerns at this time.} ; {Activity date: 12/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues or concerns at this time.} ; {Activity date: 10/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out noted. No controls in place at this time.} ; {Activity date: 10/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out noted. No controls in place at this time.} ; {Activity date: 10/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out to be noted.} | |
02/13/2020 | ENGR Grading Final | Passed | {Activity date: 02/13/2020; Status: Approved; Inspector: RLEDONNNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 02/03/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS OKAY FIOR A TCO AT THIS TIME PENDING ALL OTHER INSPECTIONS. THIS SITE IS NOT READY AT THIS TIME FOR A FINAL, ALL THE LANDSCAPE ITEMS HAVE NOT BEEN COMPLETED AT THS TIME. COMPLEETE PLANTING THROUGHOUT AS SHOWN ON THE APPROVED PLANS. PLACE DG OR HYDROSEED IN ALL THE REMAINING DISTURBED AREAS THAT REMAIN WITH DISTURBED SOIL. THIS WILL INCLUDME THE AREA NORTH OF THE NEW TRASH ENCLOSURE, AND ALL AREAS TOWARDS THE NORTHWEST CORNER OF THE SITE. INSTALL THE HANDICAP SIGNS AT THE PROPER HEIGHT OF 7 FOOT CLEARANCE ABOVE GRADE. REMOVE THE BOLLARDS AS DISCUSSED ON THE SOUTH SIDE OF THE SITE ADJACENT TO THE FUTURE SIGN LOCATION, SO THAT THE CORRECT NUMBER OF PARKING LOCATIONS CAN BE ACCOUNTED FOR.} ; {Activity date: 01/07/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - contractor grading entryways, and doing work in the right of way.} ; {Activity date: 12/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Magnum contracting is grading and installing entrances and curbs} ; {Activity date: 10/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Concentrating on building, site has been 1/3 grade it.} |
|
02/13/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 02/13/2020; Status: Approved; Inspector: RLEDONNNE; Comment: Entered by DMERANZ1 - } |