Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0142
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/17/2020 | ENGR Grading Final | BBENEDON | Approved | Entered by DMERANZ1 - |
01/15/2020 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Pre-Grout Vertical shall overlap bond beam. Recall for slab inspection |
01/13/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DMERANZ1 - THE FOOTER WAS APPROVED LAST FRIDAY AND THE WALL HAS BEE CONSTRUCTED OVER THE PAST WEEKEND. THE GROUT FOR THIS ENCLOSURE WILL BE COMPLETED LATER THIS WEEK, AND THE CONTRACTOR WILL PROVIDE KNOCKOUT HOLES AS NEEDED FOR GROUT VERIFICATION. |
10/24/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Stemwall to ground level outside of building. |
02/03/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
02/03/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
09/09/2019 | ENGR Grading Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Vincent and John with Reliance construction, Vince 401-7618. |
02/13/2020 | ENGR Grading Final | RLEDONNNE | Approved | Entered by DMERANZ1 - |
02/03/2020 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - THIS SITE IS OKAY FIOR A TCO AT THIS TIME PENDING ALL OTHER INSPECTIONS. THIS SITE IS NOT READY AT THIS TIME FOR A FINAL, ALL THE LANDSCAPE ITEMS HAVE NOT BEEN COMPLETED AT THS TIME. COMPLEETE PLANTING THROUGHOUT AS SHOWN ON THE APPROVED PLANS. PLACE DG OR HYDROSEED IN ALL THE REMAINING DISTURBED AREAS THAT REMAIN WITH DISTURBED SOIL. THIS WILL INCLUDME THE AREA NORTH OF THE NEW TRASH ENCLOSURE, AND ALL AREAS TOWARDS THE NORTHWEST CORNER OF THE SITE. INSTALL THE HANDICAP SIGNS AT THE PROPER HEIGHT OF 7 FOOT CLEARANCE ABOVE GRADE. REMOVE THE BOLLARDS AS DISCUSSED ON THE SOUTH SIDE OF THE SITE ADJACENT TO THE FUTURE SIGN LOCATION, SO THAT THE CORRECT NUMBER OF PARKING LOCATIONS CAN BE ACCOUNTED FOR. |
01/07/2020 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - contractor grading entryways, and doing work in the right of way. |
12/06/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Magnum contracting is grading and installing entrances and curbs |
10/16/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - Concentrating on building, site has been 1/3 grade it. |