Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel10707019A
JurisdictionTucson
City of Tucson ZoningI-1
Water Course

Washes

Tucson WardWard 3
Tucson Registered NeighborhoodFlowing Wells
Major Streets & Routes

Arterial or Collector

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 1066 W GRANT RD
Date - 11/10/2024 3:11 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-59-19 North To Roger Rd. And East To Kolb Rd. 1895 1957

Permits

Address: 1066 W GRANT RD
Date - 11/10/2024 3:11 p.m.
Total Number Of Permits - (27)
Permit Status Apply Date Expired Date Unit Type Description
T21CM09967 Issued 12/30/2021 10/23/2024 Commercial Building Collocation of a new carrier (Dish Wireless) onto an existing wireless telecommunications facility.
T19OT01089 Expired 11/19/2019 06/07/2020 Sign - Permanent Digital Menu Board in drive thru
T19OT01077 Expired 11/14/2019 05/12/2020 Sign - Permanent Wall signage
T19OT01080 Expired 11/14/2019 08/03/2020 Sign - Permanent Monument sign
T19OT01081 Expired 11/14/2019 08/03/2020 Sign - Permanent Directional and drive thru signage
TR-UTL-0923-02540 Complete 09/20/2023 12/24/2023 Right-of-Way (ROW) - Utility WO T86165 - Installing 2 anchors and replacing the overhead wire between pole 181 (1066 W Grant) & pole 58 (1001 W Grant)
TR-UTL-0924-01743 Issued 09/13/2024 11/24/2024 Right-of-Way (ROW) - Utility Crews will be potholling in two locations on N Flowing Wells Rd.
DP19-0142 Complete 06/05/2019 08/11/2020 Development Package SITE/GRADING - Dunkin Donuts.
TR-ROW-0424-00352 Complete 04/01/2024 06/14/2024 Right-of-Way (ROW) AZTEC will perform 19 utility potholes for Flowing Wells Rd & Glenn Street – Design Memorandum and Imp. Plans project for PSOMAS under contract 181820-05.
T19CM04566 C OF O 06/26/2019 08/30/2020 COMBO RESTAURANT
T19RW05058 FINAL 09/10/2019 05/05/2020 ROW CLEARING AND GRUBBING ON SITE (FUTURE WORK WILL INCLUDE EXCAVATION, FOR DRIVEWAY ENTRANCES. 09/30/19 - ADDING ADDITIONAL TRAFFIC CONTROL 10/03/19 - PLAN CHANGE - ADDING 24HR CLOSURE 02/05/20 - OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
T19RW05691 FINAL 09/27/2019 10/27/2019 ROW RISER UP TEP POLE ON THE SOUTH/EAST CORNER OF GRANT AND CRAYCROFT, OVERLASH GOING WEST 34' CONTINUE GOING SOUTH 345' AND RISER DOWN. RISER DOWN AND TRENCH/BORE GOING SOUTH 98' CONTINUE GOING EAST 220' AND PLACE VAULT CONTINUE EAST 440' AND PLACE 2ND VAULT AND END OF ROW.
T19RW05711 FINAL 09/28/2019 11/27/2019 ROW JOB WILL REQUIRE ACCESS TO MH#17644 TO SPLICE FIBER A NOTICE OF TEMPORARY HOLIDAY RESTRICTION APPLIES TO THIS PERMIT AND WILL BE IN EFFECT FROM THANKSGIVING DAY TO JANUARY 2. DUE TO THE INCREASING TRAFFIC VOLUME ON MANY OF THE CITY'S ROADS, IT IS NECESSARY TO RESTRICT LANE CLOSURES ON CERTAIN ROADS DURING THE HOLIDAY SEASON. WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP
T19RW07091 FINAL 11/19/2019 11/27/2019 ROW Starting on the North side of W Grant Rd and N Flowing Wells Reset Cox Vault Per City of Tucson 20' to out of Row. NOTE: Additional activites in the area, contractor will need to coordinate traffic control setup with existing setup. ** Permit end date has been modified due to holiday restriction beginning November 28, 2019 - January 2, 2020.
T19RW07402 FINAL 12/04/2019 02/01/2020 ROW STARTING ON THE N/E CORNER OF W GRANT RD AND FLOWING WELLS RD AT TEP POLE, RISER DOWN POLE AND PULL THROUGH EXTISTING CONDUIT GING N. FOR 15' TO OUT OF ROW
T19RW07428 FINAL 12/06/2019 01/05/2020 ROW (2) 5 X 5 BELLHOLES IN DIRT/ BLKTOP ON FLOWING WELLS AND APPROX 30 FT TRENCH - TO INSTALL NEW GAS LINE APL CREWS
T20CM00075 FINAL 01/06/2020 08/03/2020 COMBO NEW COMMERCIAL TRELLIS ROOF
T20FO00108 FINAL 01/31/2020 N/A FIREOPER DUNKIN DONUTS - OCC: 42 INSIDE/PATIO 37
T20RW00378 FINAL 01/22/2020 02/21/2020 ROW NEED TO COMPLETE NEW 4" RISER ON POLE IN EXISTING RIGHT OF WAY. WO 6290577
T20RW01052 FINAL 02/20/2020 04/27/2020 ROW From the TEP pole SW corner of 1066 W Grant Rd, begin 209' aerial overlash heading North, riser down and begin 5' trench, placing 2'' conduit, continue 5' trench heading East to Vault. Continue 25' pull through existing conduit to out of ROW
T20RW01939 FINAL 03/31/2020 05/01/2020 ROW Lane closure is needed to remove transformer from pole. NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS.
T20RW06183 WITHDRWN 11/16/2020 N/A ROW KE&G WILL REMOVE AND REPLACE 8INCH SEWER, INSTALL TWO NEW SS MANHOLES. TIE OVER EXTISTING HCS LINES. ABANDON EXISTING SEWER MAIN PER EXECUTED TNE FOR 11/19/2020 to 11/25/2020; 6PM-6AM
T20RW06665 FINAL 12/30/2020 03/08/2021 ROW KE&G WILL REMOVE AND REPLACE 8INCH SEWER, INSTALL TWO NEW SS MANHOLES. TIE OVER EXTISTING HCS LINES. ABANDON EXISTING SEWER MAIN. 01/28/2021 - UPDATING PERMIT WITH APPROVED TNE - R1 1/11/2021 to 1/22/2021; 6PM-6AM 02/02/21 - UPDATING PERMIT WITH APPROVED TNE (1-29-21 TO 2/12/21) AND 30 DAY RENEWAL - R2
T21RW00475 FINAL 01/29/2021 04/07/2021 ROW KE&G WORKING NIGHT TIME ON PERMIT NUMBER T20RW06665 TO REMOVE AND REPLACE 8INCH SEWER. THIS PERMIT IS FOR SLURRY AND ASPHALT PAVEMENT WORK THAT WILL BE COMPLETED DURING DAYTIME HOURS. ONE (1) LANE CLOSURE AT A TIME. NOTE: BARRICADING SHALL BE REMOVED PRIOR TO 3:30 P.M.
T21RW02452 FINAL 05/18/2021 06/20/2021 ROW KE&G WILL COMPLETE BENCH REHABILITATION ON MANHOLE 8911-03B WORK WILL BE ONE DAY INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. MAINTAIN PEDESTRIAN ACCESS
T21RW03470 FINAL 07/26/2021 09/02/2021 ROW KE&G WILL INSTALL 3 SEWER MONUMENTS, 1 ON GRANT RD AND 2 ON FLOWING WELLS. ONE DAYTIME PARTIAL CLOSURE. 08/10/21 - PLAN ADD - R1 ADDING TO SCOPE OF WORK EMERGENCY HCS REPLACEMENT TO 2450 N FLOWING WELLS RD, BUSINESS WAS BACKING UP DUE TO BLOCKAGE PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. This project is located in a City of Tucson Archaeological Sensitivity Zone. An archaeological monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. The Arizona State Museum can furnish a list of qualified archaeologists. Please allow up to 30 days for the monitor to obtain a project-specific Arizona Antiquities Act permit before scheduling the work. The existing City of Tucson monitoring and discovery plan for excavation within an Archaeological Sensitivity Zone may be used by the monitor to obtain the permit. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
T22RW00326 FINAL 02/01/2022 05/10/2022 ROW TIE INTO TEP POLE S OF 1066 W GRANT RD HEAD N 216' OVERLASHING 48CT FIBER. RISER DOWN TEP POLE PULL THROUGH 3' OF EXISTING COX CONDUIT AND TIE INTO EXISTING COX VAULT. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. AND MUST BE A MINIMUM OF 18-FT HIGH WHEN CROSSING INTERSECTIONS, PAVEMENT AND ALLEYS. 3. MAINTAIN PEDESTRIAN ACCESS 4. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813

Plans

Address: 1066 W GRANT RD
Date - 11/10/2024 3:11 p.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-19-0142 Withdrawn 06/05/2019 08/11/2020 -- Commercial Water Harvesting Ordinance SITE/GRADING - Dunkin Donuts.

Record Requests

Address: 1066 W GRANT RD
Date - 11/10/2024 3:11 p.m.
Total Number Of Requests - (2)
Request Number Status Request Date Completed Date Type Description
REQ-0123-00621 Complete 01/05/2023 01/18/2023 Requests Collocation of a new carrier (Dish Wireless) onto an existing wireless telecommunications facility.
REQ-0324-02460 Complete 03/28/2024 04/22/2024 Requests Need extension on permit to schedule electrical inspection