Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0142
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/13/2020 | ENGR Engineering Final | RLEDONNNE | Approved | Entered by DMERANZ1 - |
01/07/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Project under construction. |
02/13/2020 | ENGR Engineering Final | RLEDONNNE | Approved | Entered by DMERANZ1 - |
02/03/2020 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DROBERT5 - THIS SITE IS OKAY FIOR A TCO AT THIS TIME PENDING ALL OTHER INSPECTIONS. THIS SITE IS NOT READY AT THIS TIME FOR A FINAL, ALL THE LANDSCAPE ITEMS HAVE NOT BEEN COMPLETED AT THS TIME. COMPLEETE PLANTING THROUGHOUT AS SHOWN ON THE APPROVED PLANS. PLACE DG OR HYDROSEED IN ALL THE REMAINING DISTURBED AREAS THAT REMAIN WITH DISTURBED SOIL. THIS WILL INCLUDME THE AREA NORTH OF THE NEW TRASH ENCLOSURE, AND ALL AREAS TOWARDS THE NORTHWEST CORNER OF THE SITE. INSTALL THE HANDICAP SIGNS AT THE PROPER HEIGHT OF 7 FOOT CLEARANCE ABOVE GRADE. REMOVE THE BOLLARDS AS DISCUSSED ON THE SOUTH SIDE OF THE SITE ADJACENT TO THE FUTURE SIGN LOCATION, SO THAT THE CORRECT NUMBER OF PARKING LOCATIONS CAN BE ACCOUNTED FOR. |