Permit Details

Status:
Complete
Type:
Development Package
Address:
1350 E BENSON HY
Address NEW:
1350 E BENSON HY
Apply Date:
05/14/2019
Applicant:
Description:
SITE/GRADING - Stark Fence Company, commercial facility.

Permit Reviews

Permit Number - DP19-0124
Permit Status: Complete
Permit Description: SITE/GRADING - Stark Fence Company, commercial facility.
Start Date Submittal Complete Date Status  
04/16/2019 DEV PKG - OK TO SUBMIT 05/16/2019 COMPLETED Review Details
04/26/2019 DEV PKG - OK TO SUBMIT 05/31/2019 COMPLETED Review Details
05/31/2019 DEV PKG 07/02/2019 COMPLETED Review Details
08/27/2020 DEV PKG - OK TO SUBMIT 10/07/2020 COMPLETED Review Details
09/12/2019 DEV PKG - RESUBMITTAL 09/24/2019 COMPLETED Review Details
09/19/2019 DEV PKG - RESUBMITTAL 09/24/2019 COMPLETED Review Details
10/07/2020 REVISION - - 1ST 10/09/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0124
Permit Description: SITE/GRADING - Stark Fence Company, commercial facility.
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/29/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/29/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved}
10/15/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
10/15/2020 SITE - Stormwater Follow-up Passed {Activity date: 10/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
10/15/2020 SITE - Stormwater Final Inspection Passed {Activity date: 10/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
10/15/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 10/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.}
10/15/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 09/11/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Denied. Please schedule All required inspections and development package permit

} ; {Activity date: 09/11/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Denied. Please schedule All required inspections and development package permit}
10/15/2020 COT - ENGR - Signage Final Passed {Activity date: 10/15/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 09/14/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Denied. Joe 891-3693 builder with property owner.
Install the pedestrian walkway from the right of way into the property. Install pedestrian gate and perimeter fencing shown on plan. Depress the landscape area 6 inches below the invert of the basin inlet. Install the concrete header specified by note 21 and page 3. Install the bollards in front of the basin as shown. Stabilize basin, plan specified seeding. Complete all work shown on civil drawings. Any changes would require City of Tucson approved plan revision. Schedule all of the required inspection codes on your development package permit.

}
10/16/2020 ENGR Grading Final Passed {Activity date: 10/16/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved}
10/21/2020 ENGR Engineering Final Passed {Activity date: 10/21/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 10/21/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 10/09/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Contractor is excavating front water retention area

} ; {Activity date: 09/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Fence construction partially completed. No activity on site} ; {Activity date: 09/14/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Denied. Joe 891-3693 builder with property owner.
Install the pedestrian walkway from the right of way into the property. Install pedestrian gate and perimeter fencing shown on plan. Depress the landscape area 6 inches below the invert of the basin inlet. Install the concrete header specified by note 21 and page 3. Install the bollards in front of the basin as shown. Stabilize basin, plan specified seeding. Complete all work shown on civil drawings. Any changes would require City of Tucson approved plan revision. Schedule all of the required inspection codes on your development package permit.

}

Documents

File Name Document Type  
REVISION LETTER, 09.25.20.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
RESPONSE_LETTER_PRELIM_REVIEW.PDF DOCUMENTS VIEW
SOILS_REPORT.PDF DOCUMENTS VIEW
COMMENT RESPONSE, 08.23.19.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
LANDSCAPE COMMENT RESP, 08.21.19.PDF DOCUMENTS VIEW
PRELIM CONSOLIDATION FORM.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER_20190919.PDF DOCUMENTS VIEW
1-10 OF10.PDF DEVELOPMENT PACKAGE VIEW