Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
3434 S KINO PW
Apply Date:
04/04/2019
Applicant:
Description:
GRADING/SWPPP - The Bridges Pad Sub-area B-3, Block 3.1st Revision is PENDING, Jan. 2021 - Plan

Permit Reviews

Permit Number - DP19-0083
Permit Status: Issued
Permit Description: GRADING/SWPPP - The Bridges Pad Sub-area B-3, Block 3.1st Revision is PENDING, Jan. 2021 - Plan
Start Date Submittal Complete Date Status  
01/15/2021 DEV PKG - OK TO SUBMIT 02/01/2021 COMPLETED Review Details
02/01/2021 REVISION - - 1ST 04/02/2021 COMPLETED Review Details
03/05/2019 DEV PKG - OK TO SUBMIT (GRADING ONLY) 04/05/2019 COMPLETED Review Details
04/09/2019 GRADING 04/16/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP19-0083
Permite Description: GRADING/SWPPP - The Bridges Pad Sub-area B-3, Block 3.1st Revision is PENDING, Jan. 2021 - Plan
Total Outstanding Inspections - 9
Last Inspection Date Description Inspector Results Comments
03/23/2020 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 03/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - The site has been rough graded, there is a large pile of materials on site. No stabilization has been performed or applied as requested}
04/12/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 04/12/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - COMPLETED STILL NEED TO FINISH THE MONUMENT IS NOT COMPLETED UNDER CONSTRUCTION.} ; {Activity date: 05/25/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE INSTALL 24 INCH RCP} ; {Activity date: 07/13/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued.} ; {Activity date: 02/12/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is no track out and no issues at this time} ; {Activity date: 02/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Controls have been installed along southwest portion of site.} ; {Activity date: 01/30/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.}
10/26/2023 PDSD Site/Engineering Division - Landscaping N/A Not Ready Pending Revision Approval
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/26/2022 PDSD Engineering Division Pre-Construction SITE N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP19-0083
Permit Description: GRADING/SWPPP - The Bridges Pad Sub-area B-3, Block 3.1st Revision is PENDING, Jan. 2021 - Plan
Total Completed Inspections - 1
Date Description Inspector Results Comments
10/26/2023 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
1-3 OF 3.PDF DEVELOPMENT PACKAGE VIEW
COT ACTIVITY PERMIT BRIDGES BLOCK 4.PDF DOCUMENTS VIEW
THE BRIDGES CONTRACTOR LETTERS 4-11-19.PDF DOCUMENTS VIEW
APPLICATION_B-III.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
COMMENT_RESP LTR, 04.08.19.PDF DOCUMENTS VIEW