Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 04/12/2022 |
SITE - Stormwater Follow-up
|
MHERNANDEZ |
Continued |
Entered by NGARCIA3 - COMPLETED STILL NEED TO FINISH THE MONUMENT IS NOT COMPLETED UNDER CONSTRUCTION. |
| 05/25/2021 |
SITE - Stormwater Follow-up
|
MHERNANDEZ |
Continued |
Entered by VLEON1 - CONTINUE INSTALL 24 INCH RCP |
| 07/13/2020 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by JSCHNEI2 - Continued. |
| 02/12/2020 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - There is no track out and no issues at this time |
| 02/06/2020 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - Controls have been installed along southwest portion of site. |
| 01/30/2020 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - No issues at this time. |