Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: DP19-0083

Parcel: 132130690


Addresses:

3434 S KINO PW

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/30/2020 ENGR Engineering Final BBENEDON Continued Entered by PAHUMAD1 - Continued. No activity on site at this time. Rough grading has been completed. There is a large material stock pile on site. No stabilization has been applied.
09/04/2020 ENGR Engineering Final BBENEDON Continued Entered by RSALDAT1 - Continued. Site has been graded, there was no activity on the site at this time. No stabilization has been applied to the large area of disturbed dirt as previously requested.
02/06/2020 ENGR Engineering Final BBENEDON Continued Entered by DMERANZ1 - Greg plans to have grading completed by Monday. Please provide stabilization of all disturb.
ENGR Engineering Final Requested