Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
6721 S RENAISSANCE DR
Apply Date:
02/27/2019
Applicant:
Description:
SITE/GRADING - S & R Cabinetry, manufacturing and future building.

Permit Reviews

Permit Number - DP19-0051
Permit Status: Complete
Permit Description: SITE/GRADING - S & R Cabinetry, manufacturing and future building.
Start Date Submittal Complete Date Status  
02/12/2019 DEV PKG - OK TO SUBMIT 03/19/2019 COMPLETED Review Details
02/27/2019 DEV PKG - OK TO SUBMIT 03/01/2019 COMPLETED Review Details
03/19/2019 DEV PKG 04/29/2019 COMPLETED Review Details
06/24/2019 DEV PKG - RESUBMITTAL 08/06/2019 COMPLETED Review Details
08/15/2019 DEV PKG - RESUBMITTAL 09/10/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP19-0051
Permite Description: SITE/GRADING - S & R Cabinetry, manufacturing and future building.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/23/2020 COT - FCON - Sprinkler - Final N/A Canceled {Activity date: 12/23/2020; Status: Not Applicable; Inspector: jvincent; Comment: Entered by JVINCEN1 - }
12/23/2020 COT - FCON - Fire - Final N/A Canceled {Activity date: 12/23/2020; Status: Not Applicable; Inspector: jvincent; Comment: Entered by JVINCEN1 - }
12/23/2020 FCON – OH Piping & Hydro N/A Canceled {Activity date: 12/23/2020; Status: Not Applicable; Inspector: jvincent; Comment: Entered by JVINCEN1 - }

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0051
Permit Description: SITE/GRADING - S & R Cabinetry, manufacturing and future building.
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/22/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 07/22/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 02/03/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE NEEDS TO HAVE THE STORMWATER POSTING COMPLETED AS WELL AS PLACING THE TRACKOUT ROCK}
07/22/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/22/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 02/03/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - Met with the contracor and discussed the job and upcoming areas that may need inspections. Reminded he contrator that they needed his Site SWPPP posting of the site as required and track out materialfiiat the site entrance}
09/10/2020 COT - ENGR - Signage Final Passed {Activity date: 09/10/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 09/10/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved}
10/27/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/27/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - }
11/23/2020 SITE - Stormwater Final Inspection Passed {Activity date: 11/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - }
11/30/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 11/30/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/03/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partially approved. Grading and landscaping in all areas except southwest corner of site have been completed.}
11/30/2020 ENGR Engineering Final Passed {Activity date: 11/30/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/30/2020 SITE - Stormwater Follow-up Passed {Activity date: 11/30/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/27/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Approved.} ; {Activity date: 07/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued.} ; {Activity date: 06/09/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - No issues. Track out on roadway is from another site.} ; {Activity date: 05/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time. I’ll track out on the street is from a different site.} ; {Activity date: 03/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Minor track out noted from site. Additional track out from other sources} ; {Activity date: 03/16/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Minor track out noted} ; {Activity date: 03/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Quite a bit of mud in the streets. I suggested that Francisco clean up the area around his sight to the best of his ability and then speak with department of transportation about track out coming from the adjacent property across the street.} ; {Activity date: 03/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - The entire street is covered in dirt, however the dirt appears to be coming from not only this site but also the two properties south of this site and at the end of this dead-end street. Remove all dirt coming from this site from public streets.} ; {Activity date: 02/18/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/03/2020; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS MISSING THE SITE POSTING, TRACKOUT ROCK, AND STORMWATER CONTROLS. THE CONTRACTOR AND ENGINEER HAS BEEN ADVISED THAT THIS SITE IS NON-COMPLIANT AND IS IN SERIOUS NEED OF MAKING SURE THAT IT IS BROUGHT BACK INTO COMPLIANCE.
THERE IS TRACKOUT NOTED IN THE STREET BUT MOST OF THIS MATERIAL IS COMING FROM ANOTHER SITE SOUTH AND WEST OF THIS SITE. THE OTHER SITE WILL BE ADVISED THAT THEY ARE CREATING TRACKOUT THAT NEEDS TO BE CLEANED UP ASAP.}
11/30/2020 ENGR Grading Final Passed {Activity date: 11/30/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Ongoing work at fire riser location} ; {Activity date: 07/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved. Final grade for asphalt

} ; {Activity date: 05/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - ContinueD. AB stockpiled on site.} ; {Activity date: 05/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor installing asphalt. Francisco at 240-8999.} ; {Activity date: 05/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Preparing final grade for asphalt in the parking area, installing sewer connection in the rear of building.} ; {Activity date: 03/12/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Landscaped areas appear to be graded per plan with room for rocks.} ; {Activity date: 03/03/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Rough grade looks good in most areas. I walk the site with Francisco, the owner at 240-8999. 6 inch depression shown for water harvesting areas.} ; {Activity date: 03/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor is spreading a B in preparation for asphalt. Buildings have been installed. Curbs have been installed.} ; {Activity date: 02/03/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS INSPECTION HAS NOT BEEN CALLED IN BUT IS BEING CHECKED AT THIS TIME DUE TO THE FACT THAT MOST OF THE BUILDING CONSTRUCTION IS AT APPOROXIMATELY 75% AT THIS TIME.
ALSO THE SITE HAS BEEN ROUGHLY GRADED FOR ALL OF THE SITE WORK AND THE CONTRACTOR IS CURRENTLY WORKING ON GRADING FOR THE NEW PARKING LOT.}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
FUGITIVE DUST.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
LANDSCAPE & SITE NPPO DOCUMENTS VIEW
NPPO.PDF DOCUMENTS VIEW
REFERENCE PLAT.PDF DOCUMENTS VIEW
SURVEY REFERENCE.PDF DOCUMENTS VIEW
SWPPP REPORT JAS ENG.PDF DOCUMENTS VIEW
T11CM03172 YARD REFERENCE.PDF DOCUMENTS VIEW
T11SA00391 CHAINLNK FENCE EAST REFERENCE.PDF DOCUMENTS VIEW
TWO LOTS REFERENCE.PDF DOCUMENTS VIEW
COMMENT LETTER RESPONSE 062319.PDF DOCUMENTS VIEW
S&R RECORDED AIRPORT DOCUMENTS VIEW
DRAINAGE STATEMENT, 06.25.19.PDF DOCUMENTS VIEW
COMMENT RESP LTR, 08.15.19.PDF DOCUMENTS VIEW
1-15 OF 15.PDF DEVELOPMENT PACKAGE VIEW