Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP19-0051

Parcel: 13824083A

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
07/22/2020 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by JSCHNEI2 - Approved
02/03/2020 PDSD Engineering Division Pre-Construction SITE DROBERTS Continued Entered by DROBERT5 - Met with the contracor and discussed the job and upcoming areas that may need inspections. Reminded he contrator that they needed his Site SWPPP posting of the site as required and track out materialfiiat the site entrance