Permit: DP19-0051

Parcel: 13824083A

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
07/22/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved
03/06/2020 ENGR Grading Final DROBERTS Partial Approval Entered by DMERANZ1 - OK FOR THE PLACEMENT OF GROUT.
03/03/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by SFLORES2 - Recall for rebar inspection for pre-grout of trash enclosure when ready.
02/19/2020 ENGR Grading Final DROBERTS Continued Entered by DMERANZ1 - MET WITH THE OWNER ON THE SITE AND LOOKED OVER THE TRASH ENCLOSURE TO BE POURED THIS WEEK. THE SIZE LOOKED TO BE PER THE APPROVED PLANS. I HAVE ADVISED HIM TO ADD ADDITIONAL REBAR IN THE WALLS AT THE CORNERS, AND AS SHOWN FOR THE FLOOR AND APPROACH,#4 AT 12 INCHES ON CENTER BOTH DIRECTIONS. LOOKED AT OTHER AREAS THROUGHOUT THE SITE FOR THE BASINS, SIDEWALKS, ACCESS RAMPS TO TNSURE THAT THERE WAS A CLEAR UNDERSTANDING ABOUT WHAT WILL BE EXPECTED IN THE FUTURE INSPECTIONS.
09/22/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - . Approved
11/30/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
06/09/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No activity on the site today. Contractor appears to be Preparing for asphalt installation.
12/20/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - NO PLANS
11/30/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/08/2020 ENGR Grading Final BBENEDON Continued Entered by VFLORES1 - Ongoing work at fire riser location
07/20/2020 ENGR Grading Final BBENEDON Approved Entered by JSCHNEI2 - Approved. Final grade for asphalt
05/18/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - ContinueD. AB stockpiled on site.
05/14/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Contractor installing asphalt. Francisco at 240-8999.
05/05/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Preparing final grade for asphalt in the parking area, installing sewer connection in the rear of building.
03/12/2020 ENGR Grading Final BBENEDON Partial Approval Entered by SFLORES2 - Landscaped areas appear to be graded per plan with room for rocks.
03/03/2020 ENGR Grading Final BBENEDON Partial Approval Entered by SFLORES2 - Rough grade looks good in most areas. I walk the site with Francisco, the owner at 240-8999. 6 inch depression shown for water harvesting areas.
03/02/2020 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is spreading a B in preparation for asphalt. Buildings have been installed. Curbs have been installed.
02/03/2020 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THIS INSPECTION HAS NOT BEEN CALLED IN BUT IS BEING CHECKED AT THIS TIME DUE TO THE FACT THAT MOST OF THE BUILDING CONSTRUCTION IS AT APPOROXIMATELY 75% AT THIS TIME. ALSO THE SITE HAS BEEN ROUGHLY GRADED FOR ALL OF THE SITE WORK AND THE CONTRACTOR IS CURRENTLY WORKING ON GRADING FOR THE NEW PARKING LOT.