Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/22/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by JSCHNEI2 - Approved |
| 03/06/2020 |
ENGR Grading Final |
DROBERTS |
Partial Approval |
Entered by DMERANZ1 - OK FOR THE PLACEMENT OF GROUT. |
| 03/03/2020 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by SFLORES2 - Recall for rebar inspection for pre-grout of trash enclosure when ready.
|
| 02/19/2020 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DMERANZ1 - MET WITH THE OWNER ON THE SITE AND LOOKED OVER THE TRASH ENCLOSURE TO BE POURED THIS WEEK. THE SIZE LOOKED TO BE PER THE APPROVED PLANS. I HAVE ADVISED HIM TO ADD ADDITIONAL REBAR IN THE WALLS AT THE CORNERS, AND AS SHOWN FOR THE FLOOR AND APPROACH,#4 AT 12 INCHES ON CENTER BOTH DIRECTIONS. LOOKED AT OTHER AREAS THROUGHOUT THE SITE FOR THE BASINS, SIDEWALKS, ACCESS RAMPS TO TNSURE THAT THERE WAS A CLEAR UNDERSTANDING ABOUT WHAT WILL BE EXPECTED IN THE FUTURE INSPECTIONS. |
| 09/22/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by JSCHNEI2 - . Approved
|
| 11/30/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 06/09/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. No activity on the site today. Contractor appears to be Preparing for asphalt installation. |
| 12/20/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - NO PLANS |
| 11/30/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/08/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VFLORES1 - Ongoing work at fire riser location |
| 07/20/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by JSCHNEI2 - Approved. Final grade for asphalt
|
| 05/18/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - ContinueD. AB stockpiled on site. |
| 05/14/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Contractor installing asphalt. Francisco at 240-8999. |
| 05/05/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Preparing final grade for asphalt in the parking area, installing sewer connection in the rear of building. |
| 03/12/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by SFLORES2 - Landscaped areas appear to be graded per plan with room for rocks. |
| 03/03/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by SFLORES2 - Rough grade looks good in most areas. I walk the site with Francisco, the owner at 240-8999. 6 inch depression shown for water harvesting areas. |
| 03/02/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor is spreading a B in preparation for asphalt. Buildings have been installed. Curbs have been installed. |
| 02/03/2020 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - THIS INSPECTION HAS NOT BEEN CALLED IN BUT IS BEING CHECKED AT THIS TIME DUE TO THE FACT THAT MOST OF THE BUILDING CONSTRUCTION IS AT APPOROXIMATELY 75% AT THIS TIME.
ALSO THE SITE HAS BEEN ROUGHLY GRADED FOR ALL OF THE SITE WORK AND THE CONTRACTOR IS CURRENTLY WORKING ON GRADING FOR THE NEW PARKING LOT. |