Permit Details

Status:
Complete
Type:
Development Package
Address:
5701 S 12TH AV
Address NEW:
5701 S 12TH AV
Apply Date:
02/15/2019
Applicant:
David Little
Description:
SITE/GRADING/SWPPP - Dynamite 1 Car Wash.

Permit Reviews

Permit Number - DP19-0042
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Dynamite 1 Car Wash.
Start Date Submittal Complete Date Status  
01/16/2019 DEV PKG - OK TO SUBMIT 02/20/2019 COMPLETED Review Details
02/21/2019 DEV PKG 04/01/2019 COMPLETED Review Details
05/30/2019 DEV PKG - RESUBMITTAL 07/02/2019 COMPLETED Review Details
07/10/2019 DEV PKG - RESUBMITTAL 07/12/2019 COMPLETED Review Details
07/31/2019 DEV PKG - RESUBMITTAL 08/08/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0042
Permit Description: SITE/GRADING/SWPPP - Dynamite 1 Car Wash.
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/17/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/17/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Superintendent Chris 909-4628. WLB engineering. Dynamite car wash expansion. The site is .7 acres. Controls have been installed. Schedule inspections to the IVR system or through velocity hall. Obtain a copy of your development package permit. Schedule stormwater follow up inspections biweekly. The majority of theLandscaping and drainage work appears to be existing. Trash enclosure is existing. The plans call for no accessible parking spaces and no bicycle parking.
Post your address.}
10/18/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 10/18/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
06/05/2020 SITE - Stormwater Final Inspection Passed {Activity date: 06/05/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - }
06/08/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 06/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - }
06/08/2020 SITE - Stormwater Follow-up Passed {Activity date: 06/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/19/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Material stock pile in driveway.} ; {Activity date: 03/05/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - } ; {Activity date: 11/25/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues.} ; {Activity date: 11/07/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Controls are in place and there is no track out}
06/08/2020 ENGR Grading Final Passed {Activity date: 06/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/19/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Contractor installing landscape in right of way. New accessible route through ROW is out of compliance as shown on plan.} ; {Activity date: 03/05/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - THE CREWS ARE WORKING ON THE SITE WORK ALONG WITH THE BUILDING GOING VERTICAL. CURRENTLY THERE IS A CREW WORKING ON DREXEL DOING WHAT APPEARS TO BE THE SEWER TIE-IN. THIS AREA IS UNDER A TRAFFIC CONTROL PLAN FROM TRANSPORTATION DEPARTMENT.}
07/17/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/17/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 06/22/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. There is still some remaining concrete debris and a hole in the side of the depressed landscaped water harvesting area on the north side of the site} ; {Activity date: 06/19/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. OK for TCO. Waiting for completion of landscaping.} ; {Activity date: 06/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Grade and stabilize all disturbed areas. Remove debris. Remove trash dumpster in the parking area. Remove all leftover stormwater controls.
Shannon with bespoke Builder’s at 602-318-6969
Note, all work within city of Tucson right of way, outside of property line requires a department of transportation permit and inspection.} ; {Activity date: 06/17/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Chris or Shannon Will schedule all required final inspections and will send pictures of the site, parking lot, landscaping, existing basin for final inspections.}
07/17/2020 ENGR Engineering Final Passed {Activity date: 07/17/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 06/22/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. There is still some remaining concrete debris and a hole in the side of the depressed landscaped water harvesting area on the north side of the site} ; {Activity date: 06/19/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. OK for TCO. Waiting for completion of landscaping.} ; {Activity date: 06/18/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Grade and stabilize all disturbed areas. Remove debris. Remove trash dumpster in the parking area. Remove all leftover stormwater controls.
Shannon with bespoke Builder’s at 602-318-6969
Note, all work within city of Tucson right of way, outside of property line requires a department of transportation permit and inspection.} ; {Activity date: 06/17/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Chris or Shannon Will schedule all required final inspections and will send pictures of the site, parking lot, landscaping, existing basin for final inspections.} ; {Activity date: 06/08/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Chris will reschedule for finals and ready.} ; {Activity date: 06/02/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Chris expects to call for final inspections later this week.}
07/17/2020 COT - ENGR - Signage Final Passed {Activity date: 07/17/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved} ; {Activity date: 06/17/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Chris or Shannon Will schedule all required final inspections and will send pictures of the site, parking lot, landscaping, existing basin for final inspections.}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER OF INTENT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW
FINAL APPROVED DRAINAGE RPT 3-7-11.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
SOILS REPORT ADDENDUM.PDF DOCUMENTS VIEW
TEP - FACILIITES MAP.PDF DOCUMENTS VIEW
TEP - FACILITIES CHECK ON DP.PDF DOCUMENTS VIEW
TEP - REVIEW APPROVAL LETTER.PDF DOCUMENTS VIEW
COMMENT RESPONSE LTR, 05.30.19.PDF DOCUMENTS VIEW
RECORDED AVIGATION ESMT 20191120427.PDF DOCUMENTS VIEW
3RD SUBM RESPONSE LTR, 07.10.19.PDF DOCUMENTS VIEW
4TH SUBMRESPONSE LTR, 07.31.19.PDF DOCUMENTS VIEW
1-14 OF 14.PDF DEVELOPMENT PACKAGE VIEW