Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP19-0042

Parcel: 13813001E


Addresses:

5701 S 12TH AV

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
07/17/2020 ENGR Engineering Final BBENEDON Approved Entered by JSCHNEI2 - Approved
06/22/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Remove concrete and other debris from landscaped areas. Fill in the hole in the Bank of the depressed landscaped area. Shannon was informed that the work outside of the property line requires right of way permit and inspections.
06/19/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. OK for TCO. Waiting for completion of landscaping.
06/18/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Grade and stabilize all disturbed areas. Remove debris. Remove trash dumpster in the parking area. Remove all leftover stormwater controls. Shannon with bespoke Builder’s at 602-318-6969 Note, all work within city of Tucson right of way, outside of property line requires a department of transportation permit and inspection.
06/17/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Chris or Shannon Will schedule all required final inspections and will send pictures of the site, parking lot, landscaping, existing basin for final inspections.
06/03/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Chris at 909-4628. Has been told to contact his right of way Inspector with the department of transportation to inspect work done outside of the property line.
07/17/2020 ENGR Engineering Final BBENEDON Approved Entered by JSCHNEI2 - Approved
06/22/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. There is still some remaining concrete debris and a hole in the side of the depressed landscaped water harvesting area on the north side of the site
06/19/2020 ENGR Engineering Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. OK for TCO. Waiting for completion of landscaping.
06/18/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Grade and stabilize all disturbed areas. Remove debris. Remove trash dumpster in the parking area. Remove all leftover stormwater controls. Shannon with bespoke Builder’s at 602-318-6969 Note, all work within city of Tucson right of way, outside of property line requires a department of transportation permit and inspection.
06/17/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Chris or Shannon Will schedule all required final inspections and will send pictures of the site, parking lot, landscaping, existing basin for final inspections.
06/08/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Chris will reschedule for finals and ready.
06/02/2020 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. Chris expects to call for final inspections later this week.