Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/17/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by DMERANZ1 - Superintendent Chris 909-4628. WLB engineering. Dynamite car wash expansion. The site is .7 acres. Controls have been installed. Schedule inspections to the IVR system or through velocity hall. Obtain a copy of your development package permit. Schedule stormwater follow up inspections biweekly. The majority of theLandscaping and drainage work appears to be existing. Trash enclosure is existing. The plans call for no accessible parking spaces and no bicycle parking.
Post your address. |