Permit: DP18-0304
Permit Details
Apply Date:
12/18/2018
Applicant:
Jeffrey Stanley
Description:
SITE/GRADING - The Tuxon Hotel, remodel.
Permit Reviews
Permit Number - DP18-0304
Permit Status: Complete
Permit Description: SITE/GRADING - The Tuxon Hotel, remodel.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/20/2019 | DEV PKG - RESUBMITTAL | 03/28/2019 | COMPLETED |
05/04/2020 | DEV PKG - OK TO SUBMIT | 06/04/2020 | COMPLETED |
06/05/2020 | REVISION - - 2ND | 06/19/2020 | COMPLETED |
06/21/2019 | DEV PKG - RESUBMITTAL | 07/26/2019 | COMPLETED |
08/16/2019 | DEV PKG - RESUBMITTAL | 09/09/2019 | COMPLETED |
10/03/2019 | DEV PKG - OK TO SUBMIT | 11/12/2019 | COMPLETED |
11/07/2019 | REVISION - - 1ST | 12/02/2019 | COMPLETED |
11/16/2018 | DEV PKG - OK TO SUBMIT | 12/18/2018 | COMPLETED |
12/04/2019 | REVISION - - 1ST | 12/11/2019 | COMPLETED |
12/19/2018 | DEV PKG | 01/24/2019 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP18-0304
Permite Description: SITE/GRADING - The Tuxon Hotel, remodel.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2020 | ENGR Grading Final | N/A | Complete (Recurring) | {Activity date: 06/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Work in progress on main office building} ; {Activity date: 06/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 06/03/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Waiting for plan revisions for grading.} ; {Activity date: 02/26/2020; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I CONTACTED GENE WITH MW MORRISSEY AND HAVE ADVISED HIM THAT THERE IS ISSUES ON THIS PROJECT WITH THE CMU WALL THAT HAS BEEN CONSTRUCTED ON THE NORTH SIDE OF THE SITE. I ASKED TO MEET WITH HIM AND ANYONE ELSE TO DISCUSS THE ISSUES OF THE CMU WALL THAT HAS BEEN CONSTRUCTED WITHIN THE SITE VISIBILITY TRIANGLE OF THE NORTHERN DRIVEWAY. WE WILL MEET ON SITE TOMORROW MORNING AT 9:00 AM TO DETERMINE WHAT IS THE RESOLUTION FOR THIS PROBLEM.} |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0304
Permit Description: SITE/GRADING - The Tuxon Hotel, remodel.
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/27/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/27/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Gene with MW Morisey City approved plans Alex Hines December 9.} |
|
06/04/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/13/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - No issues or concerns at this time. Gene is preparing for asphalt} ; {Activity date: 01/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trackout has been cleaned. No issues or concerns at this time} ; {Activity date: 01/07/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Some track out noted. Gene MW Morisey will sweep the streets now that the rain has stopped} ; {Activity date: 12/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Muddy track out at jobsite entrance shall be cleaned as needed. Call for inspection every two weeks.} | |
06/04/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 12/27/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide track out protection at entrance.} | |
06/11/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 06/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } | |
06/23/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} | |
06/23/2020 | ENGR Engineering Final | Passed | {Activity date: 06/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 06/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Received revised plans from Gene} ; {Activity date: 06/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Plan revisions submitted to the city for review per Gene with MW Morisey } ; {Activity date: 06/02/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Provide city approved revisions for changes. Letter received for proposed changes to grading and site visibility triangles and west pedestrian access. } ; {Activity date: 05/29/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. This was an unscheduled inspection for Gene with MW Morisey. Complete work shown including parking curb stops. Clean up leftover debris on site. Correction required. Provide 6 inch depression as shown and stated in notes seven and 18. Schedule required inspections. Terminate SWPPP.} |
|
06/23/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} | |
06/23/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 06/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} |