Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
960 S FREEWAY
Apply Date:
12/18/2018
Applicant:
Jeffrey Stanley
Description:
SITE/GRADING - The Tuxon Hotel, remodel.

Permit Reviews

Permit Number - DP18-0304
Permit Status: Complete
Permit Description: SITE/GRADING - The Tuxon Hotel, remodel.
Start Date Submittal Complete Date Status  
02/20/2019 DEV PKG - RESUBMITTAL 03/28/2019 COMPLETED Review Details
05/04/2020 DEV PKG - OK TO SUBMIT 06/04/2020 COMPLETED Review Details
06/05/2020 REVISION - - 2ND 06/19/2020 COMPLETED Review Details
06/21/2019 DEV PKG - RESUBMITTAL 07/26/2019 COMPLETED Review Details
08/16/2019 DEV PKG - RESUBMITTAL 09/09/2019 COMPLETED Review Details
10/03/2019 DEV PKG - OK TO SUBMIT 11/12/2019 COMPLETED Review Details
11/07/2019 REVISION - - 1ST 12/02/2019 COMPLETED Review Details
11/16/2018 DEV PKG - OK TO SUBMIT 12/18/2018 COMPLETED Review Details
12/04/2019 REVISION - - 1ST 12/11/2019 COMPLETED Review Details
12/19/2018 DEV PKG 01/24/2019 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP18-0304
Permite Description: SITE/GRADING - The Tuxon Hotel, remodel.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/17/2020 ENGR Grading Final N/A Complete (Recurring) {Activity date: 06/17/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Work in progress on main office building} ; {Activity date: 06/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 06/03/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Waiting for plan revisions for grading.} ; {Activity date: 02/26/2020; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I CONTACTED GENE WITH MW MORRISSEY AND HAVE ADVISED HIM THAT THERE IS ISSUES ON THIS PROJECT WITH THE CMU WALL THAT HAS BEEN CONSTRUCTED ON THE NORTH SIDE OF THE SITE. I ASKED TO MEET WITH HIM AND ANYONE ELSE TO DISCUSS THE ISSUES OF THE CMU WALL THAT HAS BEEN CONSTRUCTED WITHIN THE SITE VISIBILITY TRIANGLE OF THE NORTHERN DRIVEWAY. WE WILL MEET ON SITE TOMORROW MORNING AT 9:00 AM TO DETERMINE WHAT IS THE RESOLUTION FOR THIS PROBLEM.}

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0304
Permit Description: SITE/GRADING - The Tuxon Hotel, remodel.
Total Completed Inspections - 8
Date Description Inspector Results Comments
12/27/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/27/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Gene with MW Morisey
City approved plans Alex Hines December 9.}
06/04/2020 SITE - Stormwater Follow-up Passed {Activity date: 06/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 05/13/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - No issues or concerns at this time. Gene is preparing for asphalt} ; {Activity date: 01/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trackout has been cleaned. No issues or concerns at this time} ; {Activity date: 01/07/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Some track out noted. Gene MW Morisey will sweep the streets now that the rain has stopped} ; {Activity date: 12/27/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Muddy track out at jobsite entrance shall be cleaned as needed. Call for inspection every two weeks.}
06/04/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 06/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 12/27/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide track out protection at entrance.}
06/11/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 06/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - }
06/23/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.}
06/23/2020 ENGR Engineering Final Passed {Activity date: 06/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 06/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Received revised plans from Gene} ; {Activity date: 06/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Plan revisions submitted to the city for review per Gene with MW Morisey

} ; {Activity date: 06/02/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Provide city approved revisions for changes. Letter received for proposed changes to grading and site visibility triangles and west pedestrian access.

} ; {Activity date: 05/29/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. This was an unscheduled inspection for Gene with MW Morisey. Complete work shown including parking curb stops. Clean up leftover debris on site. Correction required. Provide 6 inch depression as shown and stated in notes seven and 18. Schedule required inspections. Terminate SWPPP.}
06/23/2020 SITE - Stormwater Final Inspection Passed {Activity date: 06/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.}
06/23/2020 COT - ENGR - Signage Final Passed {Activity date: 06/23/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved.}

Documents

File Name Document Type  
REVISION LETTER, 06.05.2020.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE_STATEMENT.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
ATTACHMENT A - AVIGATION EASEMENT - TUS.PDF DOCUMENTS VIEW
RESPONSE LETTER, 06.21.19.PDF DOCUMENTS VIEW
RESPONSE LETTER, 08.16.19.PDF DOCUMENTS VIEW
BACKWATER VALVE.PDF DOCUMENTS VIEW
REVISION LTR, 11.12.19.PDF DOCUMENTS VIEW
1-11 OF 11.PDF DEVELOPMENT PACKAGE VIEW