Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP18-0304
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/23/2020 | ENGR Engineering Final | BBENEDON | Approved | Entered by RSALDAT1 - Approved. |
05/29/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. This was an unscheduled inspection for Gene with MW Morisey. Complete work shown including parking curb stops. Clean up leftover debris on site. Correction required. Provide 6 inch depression as shown and stated in notes seven and 18. Schedule required inspections. Terminate SWPPP. |
06/23/2020 | ENGR Engineering Final | BBENEDON | Approved | Entered by RSALDAT1 - Approved. |
06/22/2020 | ENGR Engineering Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Received revised plans from Gene |
06/03/2020 | ENGR Engineering Final | BBENEDON | Continued | Entered by RSALDAT1 - Continued. Plan revisions submitted to the city for review per Gene with MW Morisey |
06/02/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Provide city approved revisions for changes. Letter received for proposed changes to grading and site visibility triangles and west pedestrian access. |
05/29/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. This was an unscheduled inspection for Gene with MW Morisey. Complete work shown including parking curb stops. Clean up leftover debris on site. Correction required. Provide 6 inch depression as shown and stated in notes seven and 18. Schedule required inspections. Terminate SWPPP. |