Permit: DP18-0304

Parcel: 11623063C


Addresses:

960 S FREEWAY


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP18-0304

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/06/2020 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
12/27/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Pre-grout inspection.
12/19/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Dumpster footing and bollards.
06/17/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Work in progress on main office building
06/04/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 -
06/03/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Waiting for plan revisions for grading.
02/26/2020 ENGR Grading Final DROBERTS Correction Required Entered by DROBERT5 - I CONTACTED GENE WITH MW MORRISSEY AND HAVE ADVISED HIM THAT THERE IS ISSUES ON THIS PROJECT WITH THE CMU WALL THAT HAS BEEN CONSTRUCTED ON THE NORTH SIDE OF THE SITE. I ASKED TO MEET WITH HIM AND ANYONE ELSE TO DISCUSS THE ISSUES OF THE CMU WALL THAT HAS BEEN CONSTRUCTED WITHIN THE SITE VISIBILITY TRIANGLE OF THE NORTHERN DRIVEWAY. WE WILL MEET ON SITE TOMORROW MORNING AT 9:00 AM TO DETERMINE WHAT IS THE RESOLUTION FOR THIS PROBLEM.
12/27/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Courtyard stormwater piping was inspected by building inspector because development package plan had not been approved at time of installation according to Gene.
12/19/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Gene with Barker Morrissey please call for preconstruction meeting