Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP18-0304

Parcel: 11623063C


Addresses:

960 S FREEWAY


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP18-0304

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
06/04/2020 SITE - Stormwater Follow-up BBENEDON Approved Entered by RSALDAT1 -
05/13/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by RSALDAT1 - No issues or concerns at this time. Gene is preparing for asphalt
01/08/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - Trackout has been cleaned. No issues or concerns at this time
01/07/2020 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - Some track out noted. Gene MW Morisey will sweep the streets now that the rain has stopped
12/27/2019 SITE - Stormwater Follow-up BBENEDON Continued Entered by DMERANZ1 - Muddy track out at jobsite entrance shall be cleaned as needed. Call for inspection every two weeks.