Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
200 E YAVAPAI RD
Apply Date:
11/08/2018
Applicant:
Lisa Bowers
Description:
E SITE/GRADING - Literacy Connects

Permit Reviews

Permit Number - DP18-0273
Permit Status: Complete
Permit Description: E SITE/GRADING - Literacy Connects
Start Date Submittal Complete Date Status  
02/08/2019 DEV PKG - RESUBMITTAL 02/26/2019 COMPLETED Review Details
03/07/2019 DEV PKG - RESUBMITTAL 03/08/2019 COMPLETED Review Details
06/17/2019 DEV PKG - REVISION 07/22/2019 COMPLETED Review Details
10/05/2018 DEV PKG - OK TO SUBMIT 11/09/2018 COMPLETED Review Details
11/09/2018 DEV PKG 12/14/2018 COMPLETED Review Details
12/31/2018 DEV PKG - RESUBMITTAL 02/01/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0273
Permit Description: E SITE/GRADING - Literacy Connects
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/23/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 10/23/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No controls are installed at this time}
10/28/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/28/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/28/2019 SITE - Stormwater Follow-up Passed {Activity date: 10/28/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/23/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 09/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time} ; {Activity date: 08/21/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues.} ; {Activity date: 07/19/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Track out in the parking lot only, no track out Yavapai} ; {Activity date: 07/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - No concerns at this time.
} ; {Activity date: 06/21/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No concerns at this time. Track out in private parking lot only.
} ; {Activity date: 06/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No concerns at this time.}
10/28/2019 SITE - Stormwater Final Inspection Passed {Activity date: 10/28/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
10/28/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/28/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/21/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trash enclosure footing is OK for concrete. I showed Niles from Kittles construction how to schedule an inspection from his development package permit, and reminded him to call for Engineering inspections on DP 18 Dash 0273
} ; {Activity date: 06/12/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Niles with capital construction at 954-3855 post address. Site is over 1 acre however the contractor is not disturbing the entire site. Maintained all dirt on site as required at our department will not require an SWPPP, do you call for stormwater follow up inspections 09154 biweekly. Plans indicate site lighting and perimeter block wall, you will need a building combination permit as engineer in does not inspect these items. Engineering will inspect the trash enclosure footings and block walls, note vertical rebar required at 32 inches on center. Engineering Will inspect landscaping, water harvesting depressions and accessibility routes and parking as well as bicycle parking.} ; {Activity date: 05/02/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - This is an unscheduled inspection. The contractor is not on site, however work has begun. Provide SWPPP. Provide stormwater protection as required. Provide a concrete containment.
Contractor is required to schedule for a preconstruction meeting prior to the start of work.}
10/28/2019 COT - ENGR - Signage Final Passed {Activity date: 10/28/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
11/15/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 11/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/28/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete work shown on developing package plan. Depress all landscape areas as shown. Remove construction Debris from site .
Plans indicate that all accessible parking spaces are existing. The parking lot has been restriped. Existing spaces are out of compliance.}
11/15/2019 ENGR Engineering Final Passed {Activity date: 11/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/28/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete work shown on developing package plan. Depress all landscape areas as shown. Remove construction Debris from site .
Plans indicate that all accessible parking spaces are existing. The parking lot has been restriped. Existing spaces are out of compliance.} ; {Activity date: 07/25/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NOT READY AT THIS TIME.}
11/15/2019 ENGR Grading Final Passed {Activity date: 11/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 09/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No change since last inspection. Construction debris In landscaping area. Final grade has not yet been achieved. There’s no landscaping installed at this time.} ; {Activity date: 09/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor has installed bituminous penetration treatment and seal coat and mineral aggregate as noted and revise note 17.
Contractor has started to install irrigation tubing, but has not yet graded the landscaped areas. There is still piles of dirt within these areas. Depress all landscaped areas as noted on page 2 number 18 and on page 3 number 33.
} ; {Activity date: 08/21/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor has chip sealed the parking lot.
No one on site. Be sure to depress landscaping areas for water harvesting as required per plans} ; {Activity date: 07/19/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Trash enclosure slab} ; {Activity date: 07/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Contractors installing curbs. Temporary fencing has been installed.
} ; {Activity date: 07/02/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trash enclosure upper lift and bond beam OK if wall is a minimum of 5‘6“ above finished slab. Please use DP permit to schedule inspections for site work shown on the DP plan.} ; {Activity date: 06/27/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trash enclosure walls first lift} ; {Activity date: 06/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trash enclosure footing is OK for concrete. I showed Niles from Kittles construction how to schedule an inspection from his development package permit, and reminded him to call for Engineering inspections on DP 18 Dash 0273
} ; {Activity date: 05/02/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Work has begun, on the expansion of the existing building into the existing parking area.}

Documents

File Name Document Type  
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CIVIL_RESPONSE.PDF DOCUMENTS VIEW
COT_ALLOWABLE_USE_LETTER.PDF DOCUMENTS VIEW
DRAINAGE_STATEMENT.PDF DOCUMENTS VIEW
LANDSCAPE_RESPONSE.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
LANDSCAPE COMMENT RESPONSE.PDF DOCUMENTS VIEW
TDOT LANDSCAPE ROW EMAIL.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
REVISION_LETTER, 06.10.19.PDF DOCUMENTS VIEW
1-9 OF 9.PDF DEVELOPMENT PACKAGE VIEW