Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 10/28/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/23/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Depress landscape areas 6 inches below curb openings. |
| 08/21/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor started to run irrigation |
| 11/15/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/28/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete work shown on developing package plan. Depress all landscape areas as shown. Remove construction Debris from site .
Plans indicate that all accessible parking spaces are existing. The parking lot has been restriped. Existing spaces are out of compliance. |