Permit: DP18-0273

Parcel: 10604088A


Addresses:

200 E YAVAPAI RD


Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP18-0273

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
11/15/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 -
10/28/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Complete work shown on developing package plan. Depress all landscape areas as shown. Remove construction Debris from site . Plans indicate that all accessible parking spaces are existing. The parking lot has been restriped. Existing spaces are out of compliance.
07/25/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DMERANZ1 - NOT READY AT THIS TIME.
11/15/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 -
11/07/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Landscapers are working center court No change to landscape areas in the front
10/28/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Complete work shown on developing package plan. Depress all landscape areas as shown. Remove construction Debris from site . Plans indicate that all accessible parking spaces are existing. The parking lot has been restriped. Existing spaces are out of compliance.