Permit: DP18-0273

Parcel: 10604088A


Addresses:

200 E YAVAPAI RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP18-0273

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
10/23/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
10/23/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
07/19/2019 ENGR Grading Final BBENEDON Partial Approval Entered by VFLORES1 - Trash enclosure slab
07/18/2019 ENGR Grading Final BBENEDON Partial Approval Entered by VFLORES1 - Unscheduled inspection requested by Susan with Kittles construction. Contractor is installing rebar and bollards at this time, and will send pictures when it’s completed.
10/28/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
05/02/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Construction has started for the existing building expansion. Asphalt has been removed and piled on the dirt section of the lot. Concrete has been poured onto the ground in the dirt area in the back.
10/28/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
07/25/2019 ENGR Grading Final DROBERTS Not ready for Inspection Entered by DMERANZ1 - NOT READY AT THIS TIME.
11/15/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
09/12/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - No change since last inspection. Construction debris In landscaping area. Final grade has not yet been achieved. There’s no landscaping installed at this time.
09/10/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor has installed bituminous penetration treatment and seal coat and mineral aggregate as noted and revise note 17. Contractor has started to install irrigation tubing, but has not yet graded the landscaped areas. There is still piles of dirt within these areas. Depress all landscaped areas as noted on page 2 number 18 and on page 3 number 33.
08/21/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor has chip sealed the parking lot. No one on site. Be sure to depress landscaping areas for water harvesting as required per plans
07/19/2019 ENGR Grading Final BBENEDON Partial Approval Entered by VFLORES1 - Trash enclosure slab
07/18/2019 ENGR Grading Final BBENEDON Continued Entered by VFLORES1 - Contractors installing curbs. Temporary fencing has been installed.
07/02/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Trash enclosure upper lift and bond beam OK if wall is a minimum of 5‘6“ above finished slab. Please use DP permit to schedule inspections for site work shown on the DP plan.
06/27/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure walls first lift
06/21/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 - Trash enclosure footing is OK for concrete. I showed Niles from Kittles construction how to schedule an inspection from his development package permit, and reminded him to call for Engineering inspections on DP 18 Dash 0273
05/02/2019 ENGR Grading Final BBENEDON Continued Entered by CBELL1 - Work has begun, on the expansion of the existing building into the existing parking area.