Permit Details

Status:
Complete
Type:
Development Package
Address:
356 E GRANT RD
Apply Date:
02/23/2018
Applicant:
Jeffrey Stanley
Description:
E SITE/GRADING - WANG'S KITCHEN1st revision approved 11/27/18 (sheet 1-4)2nd revision pending

Permit Reviews

Permit Number - DP18-0051
Permit Status: Complete
Permit Description: E SITE/GRADING - WANG'S KITCHEN1st revision approved 11/27/18 (sheet 1-4)2nd revision pending
Start Date Submittal Complete Date Status  
02/01/2019 DEV PKG - REVISION 02/20/2019 COMPLETED Review Details
02/23/2018 DEV PKG - OK TO SUBMIT 02/28/2018 COMPLETED Review Details
03/01/2018 DEV PKG 08/29/2018 COMPLETED Review Details
08/24/2018 DEV PKG - RESUBMITTAL 09/27/2018 COMPLETED Review Details
10/01/2018 DEV PKG - RESUBMITTAL 10/10/2018 COMPLETED Review Details
10/29/2018 DEV PKG - REVISION 11/06/2018 COMPLETED Review Details
11/13/2018 DEV PKG - REVISION 02/01/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0051
Permit Description: E SITE/GRADING - WANG'S KITCHEN1st revision approved 11/27/18 (sheet 1-4)2nd revision pending
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/30/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 01/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/28/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - No controls in place} ; {Activity date: 12/18/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Provide track out protection and clean dirt from roadways. Schedule a pre-construction meeting on your development package permit}
01/30/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/14/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Owner was reminded to keep the streets clean from track out} ; {Activity date: 01/04/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/28/2018; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Spoke with Tim the general contractor over the phone. We discuss the requirements for the trash enclosure And for keeping the site clean and the track out off of the public streets}
04/02/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/02/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
04/02/2019 SITE - Stormwater Final Inspection Passed {Activity date: 04/02/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/30/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
04/02/2019 COT - ENGR - Signage Final Passed {Activity date: 04/02/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
04/10/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/10/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 02/25/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - Need to recess/deep press your landscape areas 6 inches as prescribed by your engineer. Remove the nursery steaks from the trees and secure them as shown on your landscaping detail.} ; {Activity date: 02/20/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Recess all landscaped areas 6 inches as shown on your water harvesting plan. Steak all trees as shown on your landscaping detail plan. Recall for inspection when you’re ready. Thank you}
04/10/2019 ENGR Engineering Final Passed {Activity date: 04/10/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 04/02/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Install bicycle parking. Provide a revision showing the relocation of the accessible parking spaces} ; {Activity date: 01/30/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Complete landscaped areas, note 6 inches recessed required. Complete the bicycle parking. Provide a city approved plan revision for changes of the parking spaces.}
04/10/2019 SITE - Stormwater Follow-up Passed {Activity date: 04/10/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 03/01/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - No concerns at this time.} ; {Activity date: 01/30/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - minor check out noted.} ; {Activity date: 01/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Some track out present on Grant Road. Owner of the property was informed of his responsibilities.} ; {Activity date: 12/28/2018; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - There's track out onto Grant Road. Contractor and owner made aware of the responsibility to clean any track out and to put controls in place to prevent track out}
04/10/2019 ENGR Grading Final Passed {Activity date: 04/10/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }

Documents

File Name Document Type  
1-8 OF 8.PDF DEVELOPMENT PACKAGE VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
NPP APPLICATION FOR EXCEPTION.PDF DOCUMENTS VIEW
RESPONSE LETTER 2.PDF DOCUMENTS VIEW
RESPONSE LETTER 3.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
REVISION LETTER 2.PDF DOCUMENTS VIEW