Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/10/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by CBELL1 - |
| 04/02/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - |
| 01/30/2019 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by CBELL1 - note 6 foot fence has been installed as noted in LHN. |
| 04/10/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by CBELL1 - |
| 04/02/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Install bicycle parking. Provide a revision showing the relocation of the accessible parking spaces |
| 01/30/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Complete landscaped areas, note 6 inches recessed required. Complete the bicycle parking. Provide a city approved plan revision for changes of the parking spaces. |