Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP18-0051
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/30/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by CBELL1 - |
01/14/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Continued | Entered by CBELL1 - Owner was reminded to keep the streets clean from track out |
01/04/2019 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by CBELL1 - |
12/28/2018 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Partial Approval | Entered by CBELL1 - Spoke with Tim the general contractor over the phone. We discuss the requirements for the trash enclosure And for keeping the site clean and the track out off of the public streets |