Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/15/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 01/14/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by CBELL1 - Single trash enclosure was installed without a bond beam. Owner told inspection is pending instruction from Dave Roberts |
| 01/04/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by CBELL1 - Pre grout for trash enclosure to 40 in is okay |
| 12/28/2018 |
ENGR Grading Final |
BBENEDON |
Denied |
Entered by CBELL1 - Slab poured without inspection. Block wall to four feet missing joint reinforcement. Provide ladder wire at every other course |
| 12/18/2018 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by CBELL1 - Trash enclosure footings are okay for concrete. |
| 04/10/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 04/10/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 04/10/2019 |
ENGR Grading Final |
BBENEDON |
Approved |