Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
1525 N PARK AV
Address NEW:
1525 N PARK AV
Apply Date:
02/14/2018
Applicant:
Description:
E SITE/GRADING - Prime Leaf Dispensary

Permit Reviews

Permit Number - DP18-0043
Permit Status: Complete
Permit Description: E SITE/GRADING - Prime Leaf Dispensary
Start Date Submittal Complete Date Status  
02/14/2018 DEV PKG - OK TO SUBMIT 02/14/2018 COMPLETED Review Details
02/22/2018 DEV PKG 03/23/2018 COMPLETED Review Details
03/07/2019 DEV PKG - REVISION 04/03/2019 COMPLETED Review Details
05/04/2018 DEV PKG - RESUBMITTAL 06/08/2018 COMPLETED Review Details
06/08/2018 DEV PKG - RESUBMITTAL 06/26/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0043
Permit Description: E SITE/GRADING - Prime Leaf Dispensary
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/06/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/06/2018; Status: Approved; Inspector: BBENEDO1; Comment: Entered by BBENEDO1 - IVRS - Inspection :*}
09/11/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 09/11/2018; Status: Approved; Inspector: BBENEDO1; Comment: Entered by BBENEDO1 - IVRS - Inspection :*}
05/16/2019 SITE - Stormwater Follow-up Passed {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete the work shown on the DP plan. Depress all landscape areas 6 inches. Install DG and all bear surfaces as shown} ; {Activity date: 04/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No issues at this time} ; {Activity date: 04/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Minor check out loaded. Protection has been removed to make way for final grade.} ; {Activity date: 04/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No issues at this time, minor track out onto Lee Street} ; {Activity date: 04/01/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No concerns at this time} ; {Activity date: 03/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no concerns at this time} ; {Activity date: 02/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Continued.very little track out to be noted, I have no concerns at this time} ; {Activity date: 11/05/2018; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - controls in place no track out} ; {Activity date: 10/25/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No track out present.} ; {Activity date: 09/26/2018; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - controlls in place for both drive ways, no track out}
05/16/2019 ENGR Grading Final Passed {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 04/18/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Contractors performing work in the right of way and has barricades in place} ; {Activity date: 04/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Contractor has started site grading and is installing curbs and is working with right of way where necessary at new entry onto Park Avenue.} ; {Activity date: 02/04/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Contractor will start curbs and sidewalks this week} ; {Activity date: 10/25/2018; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - contractor starting site work} ; {Activity date: 09/11/2018; Status: Partial Approval; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - trackout prevention, waddles ok
Starting over ex}
05/16/2019 SITE - Stormwater Final Inspection Passed {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }
05/20/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete the work shown on the DP plan. Depress all landscape areas 6 inches. Install DG and all bear surfaces as shown}
05/20/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - APPROVED UPON 9190 APPROVAL}
05/20/2019 ENGR Engineering Final Passed {Activity date: 05/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - OK to approve any remaining inspections for this activity.} ; {Activity date: 09/07/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - John with Reliance, 240-4979 office 777-6123
Plan indicates no swippp or basin.}
05/20/2019 COT - ENGR - Signage Final Passed {Activity date: 05/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }

Documents

File Name Document Type  
1-7 OF 7.PDF DEVELOPMENT PACKAGE VIEW
PERMIT.PDF DOCUMENTS VIEW