Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 05/16/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Approved |
Entered by DMERANZ1 - Complete the work shown on the DP plan. Depress all landscape areas 6 inches. Install DG and all bear surfaces as shown |
| 04/18/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - No issues at this time |
| 04/12/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - Minor check out loaded. Protection has been removed to make way for final grade. |
| 04/10/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - No issues at this time, minor track out onto Lee Street |
| 04/01/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - No concerns at this time |
| 03/15/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - There are no concerns at this time |
| 02/04/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - Continued.very little track out to be noted, I have no concerns at this time |
| 11/05/2018 |
SITE - Stormwater Follow-up
|
bbenedo1 |
Continued |
Entered by BBENEDO1 - controls in place no track out |
| 10/25/2018 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - No track out present. |
| 09/26/2018 |
SITE - Stormwater Follow-up
|
bbenedo1 |
Continued |
Entered by BBENEDO1 - controlls in place for both drive ways, no track out |