Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/20/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 05/17/2019 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - ALL REMAINING ITEMS FROM T18CM05428 WILL BE FINALIZED ON DP18-0043 PRIOR TO IT BEING IT BEING FINALED. FULL APPROVAL PENDING ALL OTHER INSPECTIONS AND THE BUILDING OFFICIALS APPROVAL |
| 05/16/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete the work shown on the DP plan. Depress all landscape areas 6 inches. Install DG and all bear surfaces as shown |
| 05/20/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - OK to approve any remaining inspections for this activity. |
| 09/07/2018 |
ENGR Engineering Final
|
bbenedo1 |
Not ready for Inspection |
Entered by BBENEDO1 - John with Reliance, 240-4979 office 777-6123
Plan indicates no swippp or basin. |