Permit: DP18-0015
Permit Details
Apply Date:
01/17/2018
Applicant:
Kyle Shepherd
Description:
GRADING/SWPPP - La Estancia de Tucson, Phase 8. Lots 689-735 and 780-806, Common Areas A and B.
Permit Reviews
Permit Number - DP18-0015
Permit Status: Issued
Permit Description: GRADING/SWPPP - La Estancia de Tucson, Phase 8. Lots 689-735 and 780-806, Common Areas A and B.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/17/2018 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 01/17/2018 | COMPLETED |
01/25/2018 | GRADING | 03/23/2018 | COMPLETED |
03/23/2018 | GRADING | 02/19/2019 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP18-0015
Permite Description: GRADING/SWPPP - La Estancia de Tucson, Phase 8. Lots 689-735 and 780-806, Common Areas A and B.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/01/2023 | ENGR Engineering Final | N/A | Partial Pass | Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site. |
10/01/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | Site is not complete at this time, complete all work as shown on the Approved Landscape plans for this site before recalling the Inspection or Additional charges will be made if significant progress on this site since the last Inspection. |
Completed Inspections
Permit Status: Issued
Permit Number: DP18-0015
Permit Description: GRADING/SWPPP - La Estancia de Tucson, Phase 8. Lots 689-735 and 780-806, Common Areas A and B.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/17/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/17/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by CBELL1 - } ; {Activity date: 04/19/2019; Status: Cancelled; Inspector: DROBERTS; Comment: Entered by CBELL1 - WILL BE RESCHEDULED FOR NEXT WEEK ONCE RON LE DONNE RETURNS} ; {Activity date: 04/05/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - } | |
10/18/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 10/18/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } | |
01/20/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | N/A | |
02/03/2023 | PDSD Site/Engineering Division - NPPO | Passed | N/A | |
05/02/2023 | SITE - Stormwater Follow-up | Passed | N/A | |
08/04/2023 | ENGR Engineering Final | Passed | ||
10/06/2023 | SITE - Stormwater Final Inspection | Passed | ||
10/06/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
10/10/2023 | ENGR Grading Final | Passed |