Permit: DP18-0015

Parcel: 99999999A

Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP18-0015

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
05/13/2022 ENGR Grading Final DROBERTS Partial Approval Entered by VVERA1 - IS PARTIAL, CREWS WORKING ON NEEDED SITE WORK AS NEEDED FOR A FULL C OF O.
04/01/2022 ENGR Grading Final DROBERTS Continued Entered by VVERA1 - CONTINUED, CREWS GOING VERTICAL ON HOUSING CONSTRUCTION, NOT READY FOR THE FINAL INSPECTION
01/21/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN/ NO CHANGE ON SITE AS OF TODAY
06/25/2021 ENGR Grading Final DROBERTS Continued Entered by VLEON1 - CONTINUED AT THIS TIME, CREWS CONTINUE TO WORK MOSTLY IN THE AREA OF ALL ON GOING HOUSES UNDER CONSTRUCTION. THEY ARE ALSO DOING MINOR UTILITY AND SITE WORK AROUND THE NEW HOMES AS NEEDED FOR FUTURE RELEASES, THIS MAY ALSO INCLUDE SIDEWALKS AND DRIVEWAYS.
05/14/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS, THIS WILL INCLUDE ALL LOTS, COMMON AREAS, AND DRAINAGE WAYS. ENSURE THAT ALL COMMON AREAS HAVE BEEN HYDROSEEDED WITH A NATIVE PLANT MIX IF DG HAS NOT BEEN PLACED OVER DISTURBED AREAS.
04/29/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
10/30/2020 ENGR Grading Final DROBERTS Continued Entered by PAHUMAD1 - GRADING INTERMEDIATE IS CONTINUED AT THIS TIME, CREWS WORKING ON LANDSCAPING ITEMS IN AREAS WHERE THEY WILL BE SEEKING A TCO IN THE FUTURE. ALL OTHER WORK ON THIS SITE MAINLY C
10/18/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on house pads and riprap in drainage areas.
08/26/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on the house pads and streets.
08/09/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on house pad.
07/26/2019 ENGR Grading Final RLEDONNE Continued Entered by VFLORES1 - No grading activity at this time.
07/12/2019 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Working on grading streets at this time.
05/03/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by CBELL1 - unable to find contractor on site. No messages
12/30/2019 ENGR Grading Final DROBERTS Continued Entered by DMERANZ1 - THE SITE WORK FOR THE COMMON AREAS HAS BEEN COMPLETE FOR THE ROADWAYS AND THE UTILITIES, CURRENTLY HE CONTRACTOR IS WORING ON THE VERTICAL CONSTRUCTION FOR THE FOLLOWING LOTS: 700-704, 719, 722-724. 727, AND 786-795. THE FOLLOWING LOTS APPEAR TO HAVE BEEN COMPLETED: 705-718, 720, 721, 725, 726. THE FOLLOWING LOTS ARE STILL MOSTLY UNDEVELOPED: 689-699, 728-735, 780-787, AND 796-806,
01/19/2023 ENGR Grading Final Complete (Recurring) There is still construction going on in this area
01/19/2023 ENGR Grading Final Complete (Recurring) There is still construction going on in this area
01/19/2023 ENGR Grading Final Complete (Recurring) There still construction going on in this area
01/19/2023 ENGR Grading Final Complete (Recurring) Who is Jill construction going on in this area
02/03/2023 ENGR Grading Final Not Ready Correct erosion within basin areas. Remove remaining construction debris.
02/03/2023 ENGR Grading Final Not Ready Correct erosion within basin areas. Remove remaining construction debris.
02/03/2023 ENGR Grading Final Not Ready Correct erosion within basin areas. Remove remaining construction debris.
02/03/2023 ENGR Grading Final Not Ready Correct erosion within basin areas. Remove remaining construction debris. stabilize bare dirt areas.
05/01/2023 ENGR Grading Final Partial Pass Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
05/01/2023 ENGR Grading Final Partial Pass Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
05/01/2023 ENGR Grading Final Partial Pass Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
05/01/2023 ENGR Grading Final Partial Pass Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
08/04/2023 ENGR Grading Final Not Ready This inspection will be rescheduled next week so that all of the sidewalks to verify that there are no damages that need to be repaired prior to Finalizing this Permit.
08/04/2023 ENGR Grading Final Not Ready FINAL INSPECTION OF SIDEWALKS WILL BE DONE THIS NEXT WEEK. PROVIDE THIS OFFICE WITH THE NOTICE OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THIS SITE.
08/04/2023 ENGR Grading Final Not Ready FINAL INSPECTION OF SIDEWALKS WILL BE DONE THIS NEXT WEEK. PROVIDE THIS OFFICE WITH THE NOTICE OF TERMINATION LETTER FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THIS SITE.
08/04/2023 ENGR Grading Final Not Ready This site will be reinspected next week to verify the condition of all sidewalks within this Subdivision
09/29/2023 ENGR Grading Final Not Ready Complete all the work on this site as shown on the approved plans prior to calling in this inspection for a final
09/29/2023 ENGR Grading Final Not Ready Complete all the work on this site as shown on the approved plans prior to calling in this inspection for a final
09/29/2023 ENGR Grading Final Passed
10/06/2023 ENGR Grading Final Passed
10/06/2023 ENGR Grading Final Passed
10/06/2023 ENGR Grading Final Passed
10/28/2022 ENGR Grading Final Partial Pass