Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP18-0015
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
10/27/2022 | ENGR Engineering Final | Not Ready | ||
06/23/2021 | ENGR Engineering Final | MHERNANDEZ | Partial Approval | Entered by VLEON1 - |
01/24/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on approved plans before calling for final. Working in common area at this time. |
01/10/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on grading plan for final. |
12/27/2019 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DMERANZ1 - WORK IS STILL ON GOING AT THIS TIME, NOT ALL OF THE LOTS HAVE BEEN CONSTRUCTED ON AT THIS TIME. PROVIDE THIS DEPARTMENT WITH ALL THE REQUIRED CLOSEOUT DOCUMENTATION (CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, APPROVED REVISED DRAWINGS, PRIOR TO SCHEDULING THIS INSPECTION. |
12/13/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by SFLORES2 - |
11/15/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on development packageFor final. |
10/18/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on development package for final grading. |
09/20/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by VFLORES1 - Complete all work on development package plan before calling for final. |
06/23/2021 | ENGR Engineering Final | MHERNANDEZ | Partial Approval | Entered by VLEON1 - PARTIAL TWO LOTS NOT COMPLETED |
12/27/2019 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DMERANZ1 - WORK IS STILL ON GOING AT THIS TIME, NOT ALL OF THE LOTS HAVE BEEN CONSTRUCTED ON AT THIS TIME. |
12/13/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by SFLORES2 - Played all work out approved plans. |
11/15/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on development package for finals. |
01/06/2023 | ENGR Engineering Final | Not Ready | ||
01/06/2023 | ENGR Engineering Final | Not Ready | standing water, mud, stormwater controls etc. | |
01/20/2023 | ENGR Engineering Final | Not Ready | Complete all work on the site prior to calling this inspection in for final approval | |
01/20/2023 | ENGR Engineering Final | Not Ready | Complete all work on this site prior to calling this inspection in for a final approval | |
02/03/2023 | ENGR Engineering Final | Not Ready | Correct erosion within basin areas. Remove remaining construction debris. stabilize bare dirt areas. | |
02/03/2023 | ENGR Engineering Final | Partial Pass | Complete all work as shown on the approved plans | |
05/01/2023 | ENGR Engineering Final | Partial Pass | Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site. | |
05/01/2023 | ENGR Engineering Final | Partial Pass | Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site. | |
08/04/2023 | ENGR Engineering Final | Passed | ||
08/04/2023 | ENGR Engineering Final | Passed |