Permit: DP18-0015

Parcel: 99999999A

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - DP18-0015

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
10/27/2022 ENGR Engineering Final Not Ready
06/23/2021 ENGR Engineering Final MHERNANDEZ Partial Approval Entered by VLEON1 -
01/24/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete all work on approved plans before calling for final. Working in common area at this time.
01/10/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete all work on grading plan for final.
12/27/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DMERANZ1 - WORK IS STILL ON GOING AT THIS TIME, NOT ALL OF THE LOTS HAVE BEEN CONSTRUCTED ON AT THIS TIME. PROVIDE THIS DEPARTMENT WITH ALL THE REQUIRED CLOSEOUT DOCUMENTATION (CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, APPROVED REVISED DRAWINGS, PRIOR TO SCHEDULING THIS INSPECTION.
12/13/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by SFLORES2 -
11/15/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete all work on development packageFor final.
10/18/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete all work on development package for final grading.
09/20/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by VFLORES1 - Complete all work on development package plan before calling for final.
06/23/2021 ENGR Engineering Final MHERNANDEZ Partial Approval Entered by VLEON1 - PARTIAL TWO LOTS NOT COMPLETED
12/27/2019 ENGR Engineering Final DROBERTS Not ready for Inspection Entered by DMERANZ1 - WORK IS STILL ON GOING AT THIS TIME, NOT ALL OF THE LOTS HAVE BEEN CONSTRUCTED ON AT THIS TIME.
12/13/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by SFLORES2 - Played all work out approved plans.
11/15/2019 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete all work on development package for finals.
01/06/2023 ENGR Engineering Final Not Ready
01/06/2023 ENGR Engineering Final Not Ready standing water, mud, stormwater controls etc.
01/20/2023 ENGR Engineering Final Not Ready Complete all work on the site prior to calling this inspection in for final approval
01/20/2023 ENGR Engineering Final Not Ready Complete all work on this site prior to calling this inspection in for a final approval
02/03/2023 ENGR Engineering Final Not Ready Correct erosion within basin areas. Remove remaining construction debris. stabilize bare dirt areas.
02/03/2023 ENGR Engineering Final Partial Pass Complete all work as shown on the approved plans
05/01/2023 ENGR Engineering Final Partial Pass Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
05/01/2023 ENGR Engineering Final Partial Pass Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
08/04/2023 ENGR Engineering Final Passed
08/04/2023 ENGR Engineering Final Passed