Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Final Inspection
Permit Number - DP18-0015
Inspection Description - SITE - Stormwater Final Inspection
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Final Inspection | Not Ready | ||
06/23/2021 | SITE - Stormwater Final Inspection | MHERNANDEZ | Partial Approval | Entered by VLEON1 - |
01/24/2020 | SITE - Stormwater Final Inspection | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work before calling for final inspection. |
01/10/2020 | SITE - Stormwater Final Inspection | RLEDONNE | Continued | Entered by DMERANZ1 - Working on common area’s house pads and sidewalks. |
12/27/2019 | SITE - Stormwater Final Inspection | DROBERTS | Not ready for Inspection | Entered by DMERANZ1 - WORK IS STILL ON GOING AT THIS TIME, NOT ALL OF THE LOTS HAVE BEEN CONSTRUCTED ON AT THIS TIME. PROVIDE THIS DEPARTMENT THE NOTICE OF TERMINATION FROM ADEQ, REMOVE ALL STORMWATER CONTROLS. |
12/13/2019 | SITE - Stormwater Final Inspection | RLEDONNE | Not ready for Inspection | Entered by SFLORES2 - |
11/15/2019 | SITE - Stormwater Final Inspection | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on development package for finals. |
10/18/2019 | SITE - Stormwater Final Inspection | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all workDrainage areas for final. |
01/06/2023 | SITE - Stormwater Final Inspection | Not Ready | Notice of termination for SWPPP permit required for final inspection | |
01/20/2023 | SITE - Stormwater Final Inspection | Not Ready | Complete all the work on this site prior to calling in for the final inspection | |
02/03/2023 | SITE - Stormwater Final Inspection | Complete (Recurring) | Complete I’ll work on this site tried to call him this inspection in for a Final | |
03/17/2023 | SITE - Stormwater Final Inspection | Not Ready | Complete all work is shown on the approved plans prior to calling this Inspection In for the final approval. This will include all landscaping for the original project. | |
05/01/2023 | SITE - Stormwater Final Inspection | Partial Pass | Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site. | |
06/23/2023 | SITE - Stormwater Final Inspection | Not Ready | For a final on stormwater contact Dave Roberts | |
08/04/2023 | SITE - Stormwater Final Inspection | Not Ready | Provide this Department with the Notice of Termination from Arizona Department of Environmental Quality prior to requesting this Final Inspection | |
09/01/2023 | SITE - Stormwater Final Inspection | Not Ready | Multiple areas have runoff on sidewalks and streets that need attention. | |
10/06/2023 | SITE - Stormwater Final Inspection | Passed |