Permit: DP18-0015

Parcel: 99999999A

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Final Inspection

Permit Number - DP18-0015

Inspection Description - SITE - Stormwater Final Inspection

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Final Inspection Not Ready
06/23/2021 SITE - Stormwater Final Inspection MHERNANDEZ Partial Approval Entered by VLEON1 -
01/24/2020 SITE - Stormwater Final Inspection RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete all work before calling for final inspection.
01/10/2020 SITE - Stormwater Final Inspection RLEDONNE Continued Entered by DMERANZ1 - Working on common area’s house pads and sidewalks.
12/27/2019 SITE - Stormwater Final Inspection DROBERTS Not ready for Inspection Entered by DMERANZ1 - WORK IS STILL ON GOING AT THIS TIME, NOT ALL OF THE LOTS HAVE BEEN CONSTRUCTED ON AT THIS TIME. PROVIDE THIS DEPARTMENT THE NOTICE OF TERMINATION FROM ADEQ, REMOVE ALL STORMWATER CONTROLS.
12/13/2019 SITE - Stormwater Final Inspection RLEDONNE Not ready for Inspection Entered by SFLORES2 -
11/15/2019 SITE - Stormwater Final Inspection RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete all work on development package for finals.
10/18/2019 SITE - Stormwater Final Inspection RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete all workDrainage areas for final.
01/06/2023 SITE - Stormwater Final Inspection Not Ready Notice of termination for SWPPP permit required for final inspection
01/20/2023 SITE - Stormwater Final Inspection Not Ready Complete all the work on this site prior to calling in for the final inspection
02/03/2023 SITE - Stormwater Final Inspection Complete (Recurring) Complete I’ll work on this site tried to call him this inspection in for a Final
03/17/2023 SITE - Stormwater Final Inspection Not Ready Complete all work is shown on the approved plans prior to calling this Inspection In for the final approval. This will include all landscaping for the original project.
05/01/2023 SITE - Stormwater Final Inspection Partial Pass Complete all work as shown on the approved plans prior to scheduling this site for a final. This will include all landscaping for the site That may be included on DP17-0037. This site will be rescheduled for a sidewalk inspection for May 4 to be done by David Roberts. After that inspection, it will be determined what punchlist items will be needed and required prior to the full approval on this site.
06/23/2023 SITE - Stormwater Final Inspection Not Ready For a final on stormwater contact Dave Roberts
08/04/2023 SITE - Stormwater Final Inspection Not Ready Provide this Department with the Notice of Termination from Arizona Department of Environmental Quality prior to requesting this Final Inspection
09/01/2023 SITE - Stormwater Final Inspection Not Ready Multiple areas have runoff on sidewalks and streets that need attention.
10/06/2023 SITE - Stormwater Final Inspection Passed