Permit: DP17-0297
Permit Details
Status:
Complete
Type:
Development Package
Address:
5931 S RANDALL BL
Address NEW:
5931 S RANDALL BL
Apply Date:
12/18/2017
Applicant:
Rick Gonzalez
Description:
TENTATIVE PLAT/GRADE/SWPPP - SUENO HERMOSO, LOTS 1-6
Permit Reviews
Permit Number - DP17-0297
Permit Status: Complete
Permit Description: TENTATIVE PLAT/GRADE/SWPPP - SUENO HERMOSO, LOTS 1-6
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2018 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 06/15/2018 | COMPLETED |
| 06/15/2018 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 08/30/2018 | COMPLETED |
| 08/29/2018 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 10/15/2018 | COMPLETED |
| 10/15/2018 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 12/10/2018 | COMPLETED |
| 12/11/2018 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 02/15/2019 | COMPLETED |
| 12/18/2017 | DEV PKG - OK TO SUBMIT | 12/18/2017 | COMPLETED |
| 12/18/2017 | TENTATIVE PLAT REVIEW | 02/28/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0297
Permit Description: TENTATIVE PLAT/GRADE/SWPPP - SUENO HERMOSO, LOTS 1-6
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 04/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 02/26/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Contractor is installing controls and is still working on providing the required NOI.} | |
| 04/20/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 04/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 02/20/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - Left open for information only. Met with Armando 223–2525 the general contractor and Bob Boyle from Inova engineering. 481-5987. Engineer and architect Rick/ Gonzalez 850-7401. Developer Carter Bostwyck. Post site address. Provide SWPPP and required signage. Install controls. Schedule inspection for stormwater controls when ready. Schedule stormwater follow up inspections by weekly. We have seven native plants to preserve in place and two to be relocated they have been tagged.} |
|
| 04/28/2020 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 04/28/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/27/2020; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 04/20/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Complete all work shown on your plans. Provide ground covering for all common areas and riprap were necessary due to slope. Terminate SWPPP after completing all work as required for final approval. Inspection with Armando at 223-2525. Unable to access plans on Pro.} ; {Activity date: 04/20/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } | |
| 04/28/2020 | COT - ENGR - Signage Final | Passed | {Activity date: 04/28/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/20/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Complete all work shown on your plans. Provide ground covering for all common areas and riprap were necessary due to slope. Terminate SWPPP after completing all work as required for final approval. Inspection with Armando at 223-2525. Unable to access plans on Pro.} | |
| 05/29/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/29/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/28/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Correct slope at basin. 3 to 1 specified. Contact designer for instruction. Provide ground covering in bear areas along fence and in. Triangle portion disturbed during construction although outside of property line. Provide Termination of SWPPP. } ; {Activity date: 04/20/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Complete all work shown on your plans. Provide ground covering for all common areas and riprap were necessary due to slope. Terminate SWPPP after completing all work as required for final approval. Inspection with Armando at 223-2525. Unable to access plans on Pro.} |
|
| 05/29/2020 | ENGR Engineering Final | Passed | {Activity date: 05/29/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/28/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Correct slope at basin. 3 to 1 specified. Contact designer for instruction. Provide ground covering in bear areas along fence and in. Triangle portion disturbed during construction although outside of property line. Provide Termination of SWPPP. } ; {Activity date: 04/20/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Complete all work shown on your plans. Provide ground covering for all common areas and riprap were necessary due to slope. Terminate SWPPP after completing all work as required for final approval. Inspection with Armando at 223-2525. Unable to access plans on Pro.} |
|
| 05/29/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 05/29/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 02/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - No issues at this time} ; {Activity date: 01/16/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time} ; {Activity date: 03/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - I spoke with Amado about keeping the rocks out of the roadway and onto the site and about dust control} ; {Activity date: 03/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The site is locked at this time due to a rain day. Controls are in good condition there is no track out into the street, no issues at this time} | |
| 05/29/2020 | ENGR Grading Final | Passed | {Activity date: 05/29/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } | |
| 05/29/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/29/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - } ; {Activity date: 04/28/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Correct slope at basin. 3 to 1 specified. Contact designer for instruction. Provide ground covering in bear areas along fence and in. Triangle portion disturbed during construction although outside of property line. Provide Termination of SWPPP. } ; {Activity date: 04/20/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Complete all work shown on your plans. Provide ground covering for all common areas and riprap were necessary due to slope. Terminate SWPPP after completing all work as required for final approval. Inspection with Armando at 223-2525. Unable to access plans on Pro.} |