Inspection Status: Canceled
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/14/2020 |
ENGR Grading Final |
BBENEDON |
Not Applicable |
Entered by SFLORES2 - |
| 04/20/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 02/14/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by SFLORES2 - Contractor installing drainage swale as shown. Basin has been rough graded. Overflow and sidewalk scuppers within the right of way was inspected by right of way. |
| 01/16/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Progress inspection. Contractor has started to install sidewalks in common areas. Contractor is completing final grade in the streets and preparing for asphalt. |
| 03/15/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - contractor is grading site at this time |
| 03/12/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - contractor is in the process of grading the site |
| 02/26/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Contractor is installing controls, address has been posted, the native plants have been identified. I met with Amado 223-2525. |
| 05/29/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 05/29/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - |