Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: DP17-0297
Parcel: 14025075A

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW

Permit Number - DP17-0297
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/16/2018 SVALENZ1 START PLANS SUBMITTED Completed
11/08/2018 LOREN MAKUS ENGINEERING REVIEW Reqs Change Once the TSMR is approved, and the case number and any conditions are listed on the plan, this will be accepted by Engineering.
11/08/2018 DAVID RIVERA ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Sueño Hermosa, Lots 1- 6 and Common Areas A, B, C
Development Package (4th Review)
DP17-0297

TRANSMITTAL DATE: November 8, 2018
DUE DATE: November 13, 2018

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 18, 2018.

SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS)

COMMENTS: Address the following remaining comments

1. COMMENT: The DP has been conditionally approved contingent upon the TSMR approval and if applicable compliance with any conditions of approval of the TSMR.


Previous Comment 4: Approval of the interior street proposed street cross section is required through a TSMR. Contact Steve Shields Zoning Manager for more information on the TSMR. The TSMR caser number will have to be listed in the lower right corner of all plan sheets. The TSMR case number will also have to be listed as a general note that includes the date of approval and conditions of approval. Also see the engineering comments related to the TSMR request to verify the correct Technical Standard that is to be requested for modification.

As noted above, a street must be designed with parking on sides of the street. When not providing on street parking a street must be designed with 24 foot drive lanes and vertical curbs, see T.S. 10-01.9.0 Figure 1 for street design criteria. (A TSMR is still required to use this cross section without on-street parking within the subdivision.)

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/09/2018 ANDREW CONNOR LANDSCAPE REVIEW Approved
11/13/2018 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved DP17-0297 Sueno Hermos0, Lots 1-6 / 5TH Submittal is Approved by Pima County Addressing.

Thank you,

Robin Freiman
Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
11/13/2018 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change To see review comments about the plans, please visit https://www.tucsonaz.gov/pro/pdsd/activity_search and enter activity number above.

This review has been completed and resubmittal is required. Prepare a Comment Response Letter which tells the reviewers what changes have been made to the plan and what comments are addressed. When you have made the necessary corrections to the plans, please resubmit the following items to permit counter.

plans will re-enter the 20 working day review cycle:
1) Corrected plan set
2) Items requested by review staff

Please remember to name your files appropriately, for example: second (2nd) submittal,
2_plan_set.pdf
2_response_letter.pdf

Final Status

Task End Date Reviewer's Name Type of Review Description
12/10/2018 QJONES1 APPROVAL SHELF Completed
12/10/2018 QJONES1 OUT TO CUSTOMER Completed
12/10/2018 QJONES1 REJECT SHELF Completed