Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Permit Number - DP17-0297
Review Name: RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/16/2018 | SVALENZ1 | START | PLANS SUBMITTED | Completed | |
| 11/08/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | Once the TSMR is approved, and the case number and any conditions are listed on the plan, this will be accepted by Engineering. |
| 11/08/2018 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Sueño Hermosa, Lots 1- 6 and Common Areas A, B, C Development Package (4th Review) DP17-0297 TRANSMITTAL DATE: November 8, 2018 DUE DATE: November 13, 2018 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is December 18, 2018. SECTION 2-06.0.0: DEVELOPMENT PACKAGE (TENTATIVE PLATS AND SITE PLANS) COMMENTS: Address the following remaining comments 1. COMMENT: The DP has been conditionally approved contingent upon the TSMR approval and if applicable compliance with any conditions of approval of the TSMR. Previous Comment 4: Approval of the interior street proposed street cross section is required through a TSMR. Contact Steve Shields Zoning Manager for more information on the TSMR. The TSMR caser number will have to be listed in the lower right corner of all plan sheets. The TSMR case number will also have to be listed as a general note that includes the date of approval and conditions of approval. Also see the engineering comments related to the TSMR request to verify the correct Technical Standard that is to be requested for modification. As noted above, a street must be designed with parking on sides of the street. When not providing on street parking a street must be designed with 24 foot drive lanes and vertical curbs, see T.S. 10-01.9.0 Figure 1 for street design criteria. (A TSMR is still required to use this cross section without on-street parking within the subdivision.) If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package |
| 11/09/2018 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 11/13/2018 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approved | DP17-0297 Sueno Hermos0, Lots 1-6 / 5TH Submittal is Approved by Pima County Addressing. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
| 11/13/2018 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | To see review comments about the plans, please visit https://www.tucsonaz.gov/pro/pdsd/activity_search and enter activity number above. This review has been completed and resubmittal is required. Prepare a Comment Response Letter which tells the reviewers what changes have been made to the plan and what comments are addressed. When you have made the necessary corrections to the plans, please resubmit the following items to permit counter. plans will re-enter the 20 working day review cycle: 1) Corrected plan set 2) Items requested by review staff Please remember to name your files appropriately, for example: second (2nd) submittal, 2_plan_set.pdf 2_response_letter.pdf |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/10/2018 | QJONES1 | APPROVAL SHELF | Completed |
| 12/10/2018 | QJONES1 | OUT TO CUSTOMER | Completed |
| 12/10/2018 | QJONES1 | REJECT SHELF | Completed |