Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/20/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by RSALDAT1 - |
| 02/20/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by CBELL1 - Left open for information only. Met with Armando 223-2525 the general contractor and Bob Boyle from Inova engineering. 481-5987. Engineer and architect Rick/ Gonzalez 850-7401. Developer Carter Bostwyck.
Post site address. Provide SWPPP and required signage. Install controls. Schedule inspection for stormwater controls when ready. Schedule stormwater follow up inspections by weekly. We have seven native plants to preserve in place and two to be relocated they have been tagged. |