Description:
SITE/GRADING/SWPPP - The Mark, multi-family dwelling

Permit Reviews

Permit Number - DP17-0079
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - The Mark, multi-family dwelling
Start Date Submittal Complete Date Status  
03/12/2019 REVISION - - 2ND 04/12/2019 COMPLETED Review Details
04/04/2017 DEV PKG - OK TO SUBMIT 04/04/2017 COMPLETED Review Details
04/04/2017 DEV PKG 05/09/2017 COMPLETED Review Details
05/17/2017 DEV PKG - RESUBMITTAL 06/13/2017 COMPLETED Review Details
06/14/2017 DEV PKG - RESUBMITTAL 08/02/2017 COMPLETED Review Details
10/11/2017 DEV PKG - REVISION 10/27/2017 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP17-0079
Permite Description: SITE/GRADING/SWPPP - The Mark, multi-family dwelling
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/02/2019 ENGR Engineering Final N/A Partial Pass {Activity date: 08/02/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) COMPLETE THE PLACEMENT OF DECOMPOSED GRANITE IN ALL PREVIOUSLY DISTURBED AREAS, WHICH INCLUDES THE EMPTY LOT JUST EAST OF THIS SITE.
2) PROVIDE THIS DEPARTMENT WITH ALL CLOSOUT DOCUMENTATION FROM THE ENGINEER OF RECORD, REVISED DRAWINGS, CERTIFICATION LETTER, AND NOTICE OF TERMINATION FROM ADEQ PRIOR TO SCHEDULING THE FINAL GRADING INSPECTION FOR THIS DEVELOPMENT PACKAGE.} ; {Activity date: 07/29/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - INSPECTION 9027 ENGINEERING FINAL IS APPROVED AT THIS TIME. THE FOLLOWING TWO ITEMS WILL BE ADDRESSED WITH THE ACCOMPANYING DEVELOPMENT PACKAGE PRIOR TO ITS FINAL:
1) THE ADA PARKING IS NOT PER THE APPROVED DEVELOPMENT PACKAGE AND WILL NEED TO BE REVISED PRIOR TO FINAL APPROVAL.
2) COMPLETE THE PLACEMENT OF HYDRO SEED OR DECOMPOSED GRANITE IN ALL AREAS THA HAVE BEEN DISTURBED DURING CONSTRUCTION. THIS WILL INCLUDED THE STORAGE FACILITY ON THE ADJACENT PROERTY TO THE EAST OF THIS SITE.
3) COMPLETE ALL LANDSCAPING PER THE APPROVED PLANS AND PROVIDE APPROVED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE.
4) PROVIDE THE NOT FROM ADEQ FOR THIS SITE ALONG WITH THE APPROVED DRAWINGS.}

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0079
Permit Description: SITE/GRADING/SWPPP - The Mark, multi-family dwelling
Total Completed Inspections - 8
Date Description Inspector Results Comments
08/31/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/31/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 -
VINCE - UEB 480-353-1372

1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP, CALL FOR FOLLOW INSPECTION
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
3) INSTALL A CONCRETE WASH OUT ON SITE
4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PERMIT
5) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND STORM/SITE WORK
6) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS
7) POST A COPY OF YOUR NOI ON SITE}
07/08/2019 ENGR Grading Final Passed {Activity date: 07/08/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Note all work was performed without city engineering inspection. A letter from the engineer of record for this project stating that all stormwater grading was installed as shown for the approved plans, for final approval of this project.}
07/08/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 07/08/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Note all work was performed without city engineering inspection. A letter from the engineer of record for this project stating that all stormwater grading was installed as shown for the approved plans, for final approval of this project.}
07/29/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/29/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/29/2019 SITE - Stormwater Follow-up Passed {Activity date: 07/29/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WAITING FOR FINAL APPROVED REVISED DRAWINGS AND NOT FROM THE AZ DEPT. OF EVIROMENTAL QUALITY.} ; {Activity date: 07/08/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is some track out onto Tyndall Avenue.} ; {Activity date: 10/20/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THIS SITE, ALL TRACKOUT IS BEING CLEANED DURING THE DAILY OPERATIONS.}
07/29/2019 COT - ENGR - Signage Final Passed {Activity date: 07/29/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/02/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/02/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/09/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trees and plants have been installed along the north, east, and south portion of the site, but the trees have not yet been staked as shown on plan details. Work is ongoing along the west and south west portions of the site.}
08/02/2019 SITE - Stormwater Final Inspection Passed {Activity date: 08/02/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/29/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE THE NOT FROM ADEQ FOR THIS SITE AS WELL AS APPROVED REVISED DRAWINGS SHOWING THAT ENGINEERING AND ZONING HAVE APPROVED ALL CHANGES MADE TO THIS SITE.}

Documents

File Name Document Type  
001_COVER SHEET / NOTES_1 OF 24.TIF DEVELOPMENT PACKAGE VIEW
002_GRADING / PAVING NOTES_2 OF 24.TIF DEVELOPMENT PACKAGE VIEW
003_PRIVATE UTILITY NOTES_3 OF 24.TIF DEVELOPMENT PACKAGE VIEW
004_SITE_4 OF 24.TIF DEVELOPMENT PACKAGE VIEW
005_SITE_5 OF 24.TIF DEVELOPMENT PACKAGE VIEW
006_BUILDING FLOOR / UNIT ADDRESS_6 OF 24.TIF DEVELOPMENT PACKAGE VIEW
007_BUILDING FLOOR / UNIT ADDRESS_7 OF 24.TIF DEVELOPMENT PACKAGE VIEW
008_GARAGE FLOOR_8 OF 24.TIF DEVELOPMENT PACKAGE VIEW
009_GRADING / PAVING_9 OF 24.TIF DEVELOPMENT PACKAGE VIEW
010_GRADING / PAVING_10 OF 24.TIF DEVELOPMENT PACKAGE VIEW
011_PAG STANDARD DETAIL 207_11 OF 24.TIF DEVELOPMENT PACKAGE VIEW
012_SITE / GRADING / UTILITY DETAILS_12 OF 24.TIF DEVELOPMENT PACKAGE VIEW
013_SITE / GRADING DETAILS_13 OF 24.TIF DEVELOPMENT PACKAGE VIEW
014_SITE / GRADING DETAILS_14 OF 24.TIF DEVELOPMENT PACKAGE VIEW
015_HORIZONTAL CONTROL / DATA_15 OF 24.TIF DEVELOPMENT PACKAGE VIEW
016_PRIVATE UTILITY_16 OF 24.TIF DEVELOPMENT PACKAGE VIEW
017_SWPPP_17 OF 24.TIF DEVELOPMENT PACKAGE VIEW
018_LANDSCAPE NOTES_18 OF 24.TIF DEVELOPMENT PACKAGE VIEW
019_LANDSCAPE DETAILS_19 OF 24.TIF DEVELOPMENT PACKAGE VIEW
020_LANDSCAPE DETAILS_20 OF 24.TIF DEVELOPMENT PACKAGE VIEW
021_PLANTING SPECIFICATIONS_21 OF 24.TIF DEVELOPMENT PACKAGE VIEW
022_IRRIGATION SPECIFICATIONS_22 OF 24.TIF DEVELOPMENT PACKAGE VIEW
023_PLANTING_23 OF 24.TIF DEVELOPMENT PACKAGE VIEW
024_IRRIGATION_24 OF 24.TIF DEVELOPMENT PACKAGE VIEW
1 - 4262-A - TYPE I - SEWER CAPACITY RESPONSE - 2016-286.PDF DOCUMENTS VIEW
1_DP17-0079 THE MARK AT TUCSON_ADDRESSING.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
4262-A - COVENANT REGARDING DEVELOPMENT & USE OF REAL PROPERTY - RECORDED.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
REVISION LETTER, 03.04.2019.PDF DOCUMENTS VIEW