Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP17-0079
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2019 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Approved | Entered by DROBERT5 - |
07/09/2019 | PDSD Site/Engineering Division - Landscaping | BBENEDON | Partial Approval | Entered by DMERANZ1 - Trees and plants have been installed along the north, east, and south portion of the site, but the trees have not yet been staked as shown on plan details. Work is ongoing along the west and south west portions of the site. |
08/02/2019 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Approved | Entered by DROBERT5 - |
07/29/2019 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Partial Approval | Entered by DROBERT5 - INSPECTION 9027 ENGINEERING FINAL IS APPROVED AT THIS TIME. THE FOLLOWING TWO ITEMS WILL BE ADDRESSED WITH THE ACCOMPANYING DEVELOPMENT PACKAGE PRIOR TO ITS FINAL: 1) THE ADA PARKING IS NOT PER THE APPROVED DEVELOPMENT PACKAGE AND WILL NEED TO BE REVISED PRIOR TO FINAL APPROVAL. 2) COMPLETE THE PLACEMENT OF HYDRO SEED OR DECOMPOSED GRANITE IN ALL AREAS THA HAVE BEEN DISTURBED DURING CONSTRUCTION. THIS WILL INCLUDED THE STORAGE FACILITY ON THE ADJACENT PROERTY TO THE EAST OF THIS SITE. |