Permit: DP17-0079

Parcel: 12407140A


Addresses:

55 N PARK AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP17-0079

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
07/08/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 - Note all work was performed without city engineering inspection. A letter from the engineer of record for this project stating that all stormwater grading was installed as shown for the approved plans, for final approval of this project.
07/08/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 - Note all work was performed without city engineering inspection. A letter from the engineer of record for this project stating that all stormwater grading was installed as shown for the approved plans, for final approval of this project.
07/08/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 - Note all work was performed without city engineering inspection. A letter from the engineer of record for this project stating that all stormwater grading was installed as shown for the approved plans, for final approval of this project.
07/08/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 - Note all work was performed without city engineering inspection. A letter from the engineer of record for this project stating that all stormwater grading was installed as shown for the approved plans, for final approval of this project.
10/20/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CONTRACTOR HAS REMOVED A MNAHOLE SHOWN ON SHEET 10 OF 24, BUT WAS NOT ABLE TO LOCATE THE SERVICE LINE TO THE MANHOLE FROM TYNDALL.