Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP17-0079
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/31/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - VINCE - UEB 480-353-1372 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP, CALL FOR FOLLOW INSPECTION 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 3) INSTALL A CONCRETE WASH OUT ON SITE 4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PERMIT 5) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND STORM/SITE WORK 6) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS 7) POST A COPY OF YOUR NOI ON SITE |