Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: DP17-0079

Parcel: 12407140A


Addresses:

55 N PARK AV

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
08/31/2017 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - VINCE - UEB 480-353-1372 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP, CALL FOR FOLLOW INSPECTION 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 3) INSTALL A CONCRETE WASH OUT ON SITE 4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PERMIT 5) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND STORM/SITE WORK 6) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS 7) POST A COPY OF YOUR NOI ON SITE