Permit: DP17-0079

Parcel: 12407140A


Addresses:

55 N PARK AV


Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Permit Number - DP17-0079

Inspection Description - ENGR Engineering Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
08/02/2019 ENGR Engineering Final DROBERTS Partial Approval Entered by DROBERT5 - 1) COMPLETE THE PLACEMENT OF DECOMPOSED GRANITE IN ALL PREVIOUSLY DISTURBED AREAS, WHICH INCLUDES THE EMPTY LOT JUST EAST OF THIS SITE. 2) PROVIDE THIS DEPARTMENT WITH ALL CLOSOUT DOCUMENTATION FROM THE ENGINEER OF RECORD, REVISED DRAWINGS, CERTIFICATION LETTER, AND NOTICE OF TERMINATION FROM ADEQ PRIOR TO SCHEDULING THE FINAL GRADING INSPECTION FOR THIS DEVELOPMENT PACKAGE.
07/29/2019 ENGR Engineering Final DROBERTS Partial Approval Entered by DROBERT5 - INSPECTION 9027 ENGINEERING FINAL IS APPROVED AT THIS TIME. THE FOLLOWING TWO ITEMS WILL BE ADDRESSED WITH THE ACCOMPANYING DEVELOPMENT PACKAGE PRIOR TO ITS FINAL: 1) THE ADA PARKING IS NOT PER THE APPROVED DEVELOPMENT PACKAGE AND WILL NEED TO BE REVISED PRIOR TO FINAL APPROVAL. 2) COMPLETE THE PLACEMENT OF HYDRO SEED OR DECOMPOSED GRANITE IN ALL AREAS THA HAVE BEEN DISTURBED DURING CONSTRUCTION. THIS WILL INCLUDED THE STORAGE FACILITY ON THE ADJACENT PROERTY TO THE EAST OF THIS SITE. 3) COMPLETE ALL LANDSCAPING PER THE APPROVED PLANS AND PROVIDE APPROVED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE. 4) PROVIDE THE NOT FROM ADEQ FOR THIS SITE ALONG WITH THE APPROVED DRAWINGS.
08/02/2019 ENGR Engineering Final DROBERTS Approved Entered by DROBERT5 -
07/29/2019 ENGR Engineering Final DROBERTS Partial Approval Entered by DROBERT5 - INSPECTION 9027 ENGINEERING FINAL IS APPROVED AT THIS TIME. THE FOLLOWING TWO ITEMS WILL BE ADDRESSED WITH THE ACCOMPANYING DEVELOPMENT PACKAGE PRIOR TO ITS FINAL: 1) THE ADA PARKING IS NOT PER THE APPROVED DEVELOPMENT PACKAGE AND WILL NEED TO BE REVISED PRIOR TO FINAL APPROVAL. 2) COMPLETE THE PLACEMENT OF HYDRO SEED OR DECOMPOSED GRANITE IN ALL AREAS THA HAVE BEEN DISTURBED DURING CONSTRUCTION. THIS WILL INCLUDED THE STORAGE FACILITY ON THE ADJACENT PROERTY TO THE EAST OF THIS SITE. 3) COMPLETE ALL LANDSCAPING AS SHOWN ON THE APPROVED PLANS.