Permit Details

Status:
Complete
Type:
Development Package
Address:
110 S CHURCH AV
Apply Date:
02/17/2017
Applicant:
Lisa Bowers
Description:
SITE/GRADE/SWPPP/IID - The Flin (La Placita Village), SFR, coffee shop, clubhouse.1st Revision a

Permit Reviews

Permit Number - DP17-0038
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP/IID - The Flin (La Placita Village), SFR, coffee shop, clubhouse.1st Revision a
Start Date Submittal Complete Date Status  
02/17/2017 DEV PKG - OK TO SUBMIT 02/17/2017 COMPLETED Review Details
02/17/2017 DEV PKG 09/14/2017 COMPLETED Review Details
07/29/2019 DEV PKG - REVISION 08/29/2019 COMPLETED Review Details
08/07/2018 DEV PKG - RESUBMITTAL 08/07/2018 COMPLETED Review Details
08/07/2018 DEV PKG - RESUBMITTAL 09/18/2018 COMPLETED Review Details
09/15/2017 DEV PKG - RESUBMITTAL 10/25/2017 COMPLETED Review Details
09/18/2018 DEV PKG - RESUBMITTAL 10/04/2018 COMPLETED Review Details
09/26/2019 DEV PKG - REVISION 10/14/2019 COMPLETED Review Details
10/16/2020 DEV PKG - OK TO SUBMIT 11/06/2020 COMPLETED Review Details
11/06/2020 REVISION - - 2ND 01/17/2021 COMPLETED Review Details
12/20/2017 DEV PKG - RESUBMITTAL 08/30/2018 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP17-0038
Permit Description: SITE/GRADE/SWPPP/IID - The Flin (La Placita Village), SFR, coffee shop, clubhouse.1st Revision a
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/03/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 12/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
12/03/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 12/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/22/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - Stormwater controls have been installed}
12/03/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/14/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - David with TOEFL/ Dent Construction at 480 - 490 - 1690. Waddle's installed around perimeter where necessary. Install Waddles around storm drains as needed per SWIPP Install signage. Call for stormwater inspections once a month, then every two weeks once your building is above grade. Call in for inspections of stormwater drains.}
12/03/2021 COT - ENGR - Signage Final Passed {Activity date: 12/03/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
12/07/2021 SITE - Stormwater Follow-up Passed {Activity date: 12/07/2021; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - } ; {Activity date: 12/02/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH TOFEL CONSTRUCTION AND WALKED THE SITE TO SEE WHERE THEY ARE AT IN REGARDS TO A FINAL RELEASE. NO CONCERNS AT THIS TIME} ; {Activity date: 11/24/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued} ; {Activity date: 09/22/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - PARTIAL /T.C.O} ; {Activity date: 09/21/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME. NO CONCERNS AT THIS TIME, THE SITE IS NOT READY.

} ; {Activity date: 08/27/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION
} ; {Activity date: 07/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - )CN / NEED TO ADDRESS THE DOWN SPOTS COMING OFF THE BUILDING.} ; {Activity date: 10/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Work in right of way. Track out contained within right of way. West entrance has no protection

} ; {Activity date: 10/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Minor track outs noted Storage yard entrance west of project.

} ; {Activity date: 09/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor track out noted. Also many broken sandbags used for barricade on Church Avenue.} ; {Activity date: 06/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Nic with Tofel, Underground utilities require building inspections.} ; {Activity date: 06/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Track out on Church Avenue. Also barricades installed in the right of way} ; {Activity date: 05/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. There is track out on church and no protections in place. Protections have been removed along the north side of the property on Broadway and the ground has not been stabilized. Please install/reinstall controls as required and necessary.
Contact number provided was in accurate and I was unable to contact superintendent.

} ; {Activity date: 02/26/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - No issues at this time} ; {Activity date: 12/05/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS AT THIS TIME FOR THIS SITE. MOST OF THE WORK AT THIS TIME IS ON THE NEW VERTICAL BUILDING CONSTRUCTION. NO SIGNS OF TRACK-OUT OR MATERIAL LEAVING THIS SITE.} ; {Activity date: 08/22/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Controls are in place.} ; {Activity date: 07/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time} ; {Activity date: 06/25/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time} ; {Activity date: 06/21/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 06/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time.} ; {Activity date: 06/05/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS NOTED DURING THIS INSPECTION, MINOR CLEANUP ON CHURCH THROUGH THE SITE SOUTH TOWARDS THE TCC PARKING AREA.} ; {Activity date: 05/31/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS OTHER THAN MINOR TRACK-OUT ONTO CHURCH, CONTRACTOR WILL SCHEDULE A SWEEPER FOR CLEANUP.} ; {Activity date: 05/22/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There is notable track out onto Church Avenue that needs to be corrected. Louis said he has ordered a street sweeper. The side entrance has changed there is no longer track out protection installed. We also have dirt on the south side walk That needs to be cleaned up, a couple of loose fence posts that need to be picked up and the privacy barrier needs to be reattached to the fence where it’s come loose. Thank you Brian} ; {Activity date: 04/29/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CBELL1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 04/12/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CBELL1 - no site concerns noted during this walk through minor cleanup of Church Street has been advised to the Contractor.} ; {Activity date: 04/03/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CBELL1 - ALL WORK IS BEING MONITORED FOR ANY TRACKOUT.
INSPECTION 9185 GRADING INTERMEDIATE IS CONTINUED T THIS TIME. THE CREWS ARE WORKING ON THE INSTALLATION OF STORM DRAIN PIPE AT THE NORTHWEST CORNER OF THE SITE SOUTH OF THE EXISTING RETAINING WALL. THEY WILL BE TAKING PHOTOS OF THIS AREA AND SEND THEM AS THEY PLACE ADDITIONAL BACKFILL OVER THE PIPES. ADDITIONAL INSPECTIONS WILL BE SCHEDULED AS NEEDED THROUGHOUT THIS OPERATION.} ; {Activity date: 03/22/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CBELL1 - The contractor is working on the installation of storm drains on the north side of the project and general site work throughout the project no concerns at this time} ; {Activity date: 03/04/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CBELL1 - No concerns at this time, I contacted David with TOFEL COSTRUCTION and asked if there was anything else we needed to look at. He advised that they needed to look at drainage items near Broadway, we will meet onsite tomorrow morning at 6:45 am.}
12/13/2021 ENGR Engineering Final Passed {Activity date: 12/13/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 08/27/2021; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NOT READY AT THIS TIME, THERE IS TOO MUCH EXTERIOR WORK TO EVEN CONSIDER A PUNCH LIST AT THIS TIME. THIS SITE MAY BE READY TO LOOK AT A FINAL GRADING INSPECTION DURING THE LAST WEEK OF SEPTEMBER.

}
12/21/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/21/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
12/21/2021 ENGR Grading Final Passed {Activity date: 12/21/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/02/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH TOFEL CONSTRUCTION AND WALKED THE SITE TO SEE WHERE THEY ARE AT IN REGARDS TO A FINAL RELEASE. CURRENTLY THEY ARE STILL WORKING ON THE INSTALLATION OF BRICK PAVERS AT THE SOUTHEAST CORNER OF THE SITE, AND STILL HAVE SOME WORK TO PERFORM AT VARIOUS LOCATIONS THROUGHT OUT THE SITE FOR TOUCH UP AND FINALS.
IT WAS NOTED DURING THIS WALK THROUGH THAT THERE ARE STILL A FEW ITEMS THAT HAVE NOT BEEN ADDRESSED AT THIS TIME. 1) THE OVERFLOW ROOF DRAINS ARE PROTRUDING FROM THE BUILDING ON THE WEST AND SOUTH SIDES OF THE BUILDING OVER THE ADJACENT SIDEWALKS AS WELL AS PATIO SCUPPERS. THE HEIGHTS OF THESE ITEMS ARE 60 TO 72 INCHES ABOVE THE SIDEWALKS, THIS APPEARS TO BE A HEALTH AND SAFETY ISSUE. tHESE HAVE BEEN DISCUSSED OVER THE LIFE OF THE PROJECT BUT NOTHING HAS BEEN DONE. WE HAVE DISCUSSED THAT IN MOST OF THE CASES A PLANTER BOX OR POT COULD BE PLACED AT THE SAME LOCATIONS TO PREVENT ACCESS TO THE AREA WITH ONLY MINOR DISRUPTION TO THE PEDESTRIAN TRAFFIC. 2) ROOF DRAINAGE PIPE ON THE SOUTHSIDE OF THE EXISTING RESTARAUNT ON THE SOUTHSIDE OF THE SITE DEPOSIT THEIR DRAINAGE WATER DIRECTLY ONTO THE ADJACENT SIDEWALKS. THIS IS ALSO A HEALTH AND SAFETY ISSUE AND NEEDS TO BE ADDRESSED PRIOR TO THE FULL RELEASE OF THE SITE. IT HAS BEEN DISCUSSED THAT THE PLACEMENT OF A CATCHBASIN IN ONE AREA ALONG WITH A DRAINAGE PIPE POINTING SOUTH COULD RESOLVE MOST OF THE ISSUES FOR THIS PROBLEM. TOFEL WILL LET ME KNOW ASAP WHAT THEY WILL TRY TO DO.} ; {Activity date: 08/27/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME, SEE THE NOTES FOR THE ENGINEERING - FINAL ABOVE
} ; {Activity date: 05/29/2020; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved.8” HDPE,Stormwater piping as shown on page 10. Remote inspection with Jose and Wolf. OK to shade and cover with approved Phil material as specified.

} ; {Activity date: 02/26/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Nic with TOEFL dent} ; {Activity date: 07/15/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Stormwater piping corrections In the courtyard are OK to cover with your engineers specify approved fill material free from rocks and other construction debris} ; {Activity date: 07/09/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I informed Nic the superintendent that, based on my conversations with Dave Roberts and as required per the manufacture, below ground HDPE stormwater piping requires engineered fill material. Please provide a stamped letter from the engineer of record for this project specifying the type of material to be utilized for this project. Note contractor has been using native fill material on piping.} ; {Activity date: 07/08/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Three catch basins and associated piping in the old corral area are OK. Correct the tight radius elbow at the horizontal by horizontal change of direction. I also informed Nick that we will need engineers approval for the use of native fill used on HDPE piping.} ; {Activity date: 06/25/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Two 24 inch catch basin‘s east of the tunnel and building penetrations are OK to cover with approved materials. Check with the manufacture and the engineer for material specifications.
The issue regarding the building and turn on penetrations has not yet been resolved however the connections have been backfilled} ; {Activity date: 06/21/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - 24 inch plastic catch basins And associated piping installed in courtyard per approved plans are OK to cover, provided that they are backfilled in accordance with job specifications and with manufacturers installation instructions. Do not push the rocks on the side of the ditch onto the pipe. I spoke with Nick the GC and The back hoe operator for star pass pipeline.} ; {Activity date: 06/13/2019; Status: Denied; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - I walk the site with Dave Roberts and Luis from Tofel Dent It was determined that the piping installed is not in accordance with the approved drawings. Provide city approved revisions for the changes made and correct the building penetrations and piping materials as required per building codes} ; {Activity date: 06/12/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I walk the site with Nick Project superintendent, PVC stormwater piping penetrating the building exterior masonry wall and the concrete tunnel exterior walls shall be sleeved and sealed with elastomeric or mechanical means. I’ve asked the general contractor to get instructions from his project engineer and I’ll pass this information on to Dave Roberts and Bob Sherry. Contractor shall not cover these locations without approval. Additionally HDPE may not be installed within a building. There is a section of HDPE that passes through the tunnel.
Reference international plumbing code sections 303.2, 301.2, 305.2, 305.3, and 305.5.} ; {Activity date: 06/06/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - LOOKED AT THE CONTINUANCE OF THE 12 INCH CORRUGATED PLASTIC PIPE IN THE CENTER OF THE SITE RUNNING SOUTH, THESE ARE OKAY FOR BACKFILL. THE CREW IS ALSO ADDING ADDITIONAL FARTHER SOUTH IN THIS SAME AREA, THIS WILL BE CHECKED AFTER LUNCH LATER TODAY. SITE INSPECTION FOR THE AFTERNOON INSPECTION ONLY.} ; {Activity date: 06/06/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - LOOKED AT THE CONTINUANCE OF THE 12 INCH CORRUGATED PLASTIC PIPE IN THE CENTER OF THE SITE RUNNING SOUTH, THESE ARE OKAY FOR BACKFILL. THE CREW IS ALSO ADDING ADDITIONAL FARTHER SOUTH IN THIS SAME AREA, THIS WILL BE CHECKED AFTER LUNCH LATER TODAY.} ; {Activity date: 06/05/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - CREWS HAVE POURED 4 COLLARS AT VARIOUS LOCATIONS AND ARE LOOKING TO BACKFILL WITH FILL MATERIAL FROM ONSITE. HAVE ASKED THE CONTRACTOR TO MARK ALL AREAS LOOKED AT ON THE SITE DRAWINGS SO THAT THEY CAN BE CHECKED OFF AS BEING COMPLETE AT THIS TIME.} ; {Activity date: 05/31/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - APPROVED THE PLACEMENT OF BACKFILL FOR TWO CATCH BASINS LOCATED ON THE NORTH SIDE OF THE EXISTING STRUCTURES IN THE CENTRAL AREA.} ; {Activity date: 05/23/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - 8 inch and 12 inch storm drains at change of direction and transition To PVC south of tunnel with clean outs as shown on Cyprus 81/2 by 11 change to utilities plan. OK to cover, revision expected prior to final inspection. Thank you Brian} ; {Activity date: 05/22/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Starpass pipeline, Jose, has installed below grade horizontal Stormwater drain piping with short radius 90° change of direction, T-shaped cleanouts with extensions that have no direction of flow, also transitions between HDPE & PVC piping. Provide documentation and/or standards that allow these installation practices or letter of acceptance from Cypress engineering. I walked the site with Louis and also Nick from TOEFL dent construction at 310-1431.} ; {Activity date: 05/03/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Highlights for storm water piping on page 7 of 23.} ; {Activity date: 04/29/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CBELL1 - I WALKED THE SITE WITH WOLF FROM DENT/TOFEL AND INSPEC
12/21/2021 SITE - Stormwater Final Inspection Passed {Activity date: 12/21/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
CYPRESS CIVIL_REVISION_LTR, 10.16.20.PDF DOCUMENTS VIEW
LANDSCAPE_REVISION_LETTER.PDF DOCUMENTS VIEW
1-24 OF 23.PDF DEVELOPMENT PACKAGE VIEW
ADDRESSING COMMENT SUMMARY.PDF DOCUMENTS VIEW
1_LA PLACITA VILLAGE_DP17-0038_ADDRESSING.PDF DOCUMENTS VIEW
AIRPORT DISCLOSURE STATEMENT FORMFOR TUCSON INTERNATIONAL AIRPORT.PDF DOCUMENTS VIEW
AVIGATION EASEMENT - TUS.PDF DOCUMENTS VIEW
TIA COMMENT LETTER 3.10.17.PDF DOCUMENTS VIEW
APP_LA_PLACITA.PDF DOCUMENTS VIEW
CHECKLIST_LA_PLACITA_WHOLE_SITE.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
NPP_EXCEPTION_APP.PDF DOCUMENTS VIEW
COMMENT_RESPONSE_LETTER.PDF DOCUMENTS VIEW
CHANGE LETTER.PDF DOCUMENTS VIEW
DRAINAGE_STATEMENT.PDF DOCUMENTS VIEW
TIA.PDF DOCUMENTS VIEW
ADDRESSING_FLOOR PLANS.PDF DOCUMENTS VIEW
GEO_TECH_REPORT.PDF DOCUMENTS VIEW
CRL.PDF DOCUMENTS VIEW
CHANGE_LETTER.PDF DOCUMENTS VIEW
FIRE_LETTER.PDF DOCUMENTS VIEW
RELEASE_OF_EASEMENT.PDF DOCUMENTS VIEW
PARTIAL_RELEASE_NO-BUILD_EASEMT.PDF DOCUMENTS VIEW
ANDY_BEMIS_BICYCLE_APPROVAL.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
COMMENT_RESPONSE, 09.25.19.PDF DOCUMENTS VIEW
REVISION_LETTER, 07.22.19.PDF DOCUMENTS VIEW