Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: DP17-0038

Parcel: 11720016G


Addresses:

110 S CHURCH AV

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
12/03/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by DROBERT5 -
01/14/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by CBELL1 - David with TOEFL/ Dent Construction at 480 - 490 - 1690. Waddle's installed around perimeter where necessary. Install Waddles around storm drains as needed per SWIPP Install signage. Call for stormwater inspections once a month, then every two weeks once your building is above grade. Call in for inspections of stormwater drains.