Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/03/2021 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 01/14/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by CBELL1 - David with TOEFL/ Dent Construction at 480 - 490 - 1690. Waddle's installed around perimeter where necessary. Install Waddles around storm drains as needed per SWIPP Install signage. Call for stormwater inspections once a month, then every two weeks once your building is above grade. Call in for inspections of stormwater drains. |